INSTALLATION INSTRUCTIONS
INSTALLATION AND OPERATIONAL CHECKS
After installation, check for gas soundness. The supply pressure can be checked at the grill injector. Access to the injector is by first removing the baffle at the front of the grill fastened by two screws. Then remove the fastening screw on the right hand side of the burner and slide the burner off the injector. Ensure that the grill burner is correctly located under the fixing screw on reassembly.
Fit the hotplate burner bodies, caps and pan supports. Referring to the instructions for use where necessary,
1.Check that the hotplate and grill burners ignite correctly and burn with a steady flame. Check for a steady flame on the low setting.
2.Check that with the oven set to 240oC, the oven fan operates and the oven heats up.
3.Check the operation of the oven light.
Instruct the user on the operation of the cooker.
24