Wells BWB-1S manual Grid Assembly

Page 11

E.GRID ASSEMBLY

1.Turn and position the grids so that the waffle-sides are facing each other. Thread the hi-temp tubing thru the shaft of the pivot housing. Attach the pivot housing to the bottom grid with screws (bottom hole) and screws with washers (middle hole). Use anti-sieze paste on the screw threads, but do not tighten the screws yet.

2.Insert the pivot shaft thru the pivot housing and top grid, making sure wires 5, 6 & 20 are routed between the pivot shaft and the body of the top grid casting. Secure the pivot shaft with “C”clips on each end.

3.Verify that the top and bottom grids match at the mating surfaces, then tighten the screws securing the pivot housing to the bottom grid.

4.Thread the brass bushing over hi-temp tubing and the shaft of the pivot housing. Press the bushing all the way against the face of the pivot housing.

5.Install the handle asembly in the top grid. Use Loctite on the screw threads

6.Install the top grid wiring cover, then the teflon drip guide and bottom grid wiring cover. Use anti-sieze paste on the screw threads.

7.The top grid should pivot smoothly. Gently bend the upper lip of the bottom grid wiring cover until the gap between wiring covers is maintained thru the entire swing of the top grid, and the top grid closes completely on the bottom grid.

HANDLE

ASSEMBLY

TOP GRID HINGE

WIRING COVER

BOTTOM GRID HINGE

WIRING COVER

TEFLON DRIP GUIDE

9

Image 11
Contents Belgian Waffle Bakers Waffle Baker Precautions General Information General Safety ProceduresGeneral Specifications Table of ContentsFeatures and Operating Controls Precautions for Servicing this Equipment Amperage and Resistance Checks Trouble ShootingTemperature Checks Electrical Test PointsVoltage Checks Servicing Instructions Cabinet AssemblyBack Panel Assembly Bottom Grid TOP GridGrid Assembly Pivot Bearing Assembly Bypass HI-LIMIT Thermostat Wiring DiagramREF Description Part Parts BreakdownBWB-1S Belgian Waffle Baker Exploded View Service@wellsbloomfield.com