C.TOP GRID
1.Prepare grid casting by applying a small amount of
2.Feed wires 5, 6 & 20 thru the right
3.Pull the wires back until they have only a small amount of slack. Seal both sides of both
4.Install the grid cover.
D.BOTTOM GRID
1.Prepare grid casting by applying a small amount of
2.Set the grids
3.Feed the temperature probe leads and wire 10 thru the
4.Feed wires 5, 6, & 20 (from top grid) and wires
7 & 8 thru the right
5.Set the temperature probe between the two screw bosseswith its round nose pointing to the right. Slide the retainer over the probe. Install the screws with wires 10 & 20 attached to the
6.Route wires as shown. Pull the wires and
7.Install the grid cover.
see page 11
87
HI- 5 6
TEMP
TUBING
20
10
TEMP
PROBE
PROBE |
RETAINER |
GRID |
8