Frymaster FPHD65 operation manual Electronic Thermostat Controller/Computer

Page 30

HIGH EFFICIENCY DECATHLON (HD) SERIES GAS FRYERS

CHAPTER 5: CONTROLLER OPERATING INSTRUCTIONS

5.2 Electronic Thermostat Controller/Computer (cont.)

MAIN POWER SWITCH – connects/disconnects primary power; double-lighted with center position "OFF". One main switch controls two electronic thermostats/Compu-Fry or remote computers. When the main power switch is in the center position, power is removed from the two fryers controlled by the electronic thermostats/Compu-Fry or remote computers. When the main power switch is pressed to the right, power is supplied to the electronic thermostat/Compu-Fry or remote computer of each fryer.

INDIVIDUAL FRYER POWER SWITCH – this switch controls power to the individual fryer. When the power switch is in the "ON" position, the indicator light will be lighted when calling for heat. The power switch only removes power from the temperature control circuit (electronic thermostat controller). The power switch should be in the "OFF" position during filtering.

BOIL-OUT SWITCH operates only when the electronic thermostat controller is enabled. When the boil-out switch is "ON", it will bypass the melt cycle, and allow the water temperature to reach approximately 196°F (91°C).

HIGH-LIMIT RESET – this reset button is located under each individual control panel, and must be manually reset if the fryer exceeds high-limit setpoint.

FILTER RESET BREAKER (7 amp circuit breaker- 120VAC, or 5 amp circuit breaker- 230VAC)

the breaker is in line between the filter switch and the pump. Ensure filter power is off prior to resetting or replacing.

5 AMP (115VAC) or 2 AMP (230VAC) FUSE – each fryer circuit is protected by a 5 amp (115VAC) or 2 amp (230VAC) fuse located under the control panel.

5–3

Image 30
Contents Hour Service Hotline HD Models Series Gas FryersCanada Page Table of Contents High Efficiency Decathlon HD Series Gas FryersTable of Contents Applicability and Validity After PurchaseOrdering Parts Service Information Safety InformationComputer Information Service Personnel Qualified and/or Authorized Operating PersonnelReceiving and Unpacking Equipment GeneralProduct Description Principles of OperationPre-installation Rating PlateInstallation Standards Air Supply and VentilationEquipment Installed at High Altitudes Installing the Fryer Leveling the Fryer Fryers equipped with legs onlyInstalling Casters and Legs Rear Only Front OnlyGas Connections National Code RequirementsGas Supply Type and Pressure Gas Connections Gas Specifications NON-CE Altitudes of 2000 feet or lessGas Conversion Procedures CE only Altitudes of 2000 feet or lessElectrical Connections Initial Start-up Pilot Lighting Procedures, Standing Pilot Only Boil-Out Procedure Boil-Out Procedure Final Preparation Final Preparation Operating Instructions Electronic Thermostat Controller When in use Electronic Thermostat Controller/ComputerElectronic Thermostat Controller/Computer High Efficiency Decathlon HD Series GAS Fryers Filtration Filter Preparation Filter Unit TypesFilter Leaf Assembling the Filter Crumb screen properly placed Handle Applying filter powder to filter-leaf Installing the Filter Filtering Tools Operating the Filter Pan Preparation and OperationMove the red drain valve handle into the open position Filter Operation SUFF/UFF Filtration Systems Installation and Operation Do not Allow Crumbs to Accumulate in Tray Optional Filter Hose and Wand Operation Complete Filtering Hose and Wand OperationDaily WeeklySee filtration manual for filtration maintenance procedures Periodic/ AnnualStainless Steel Care Pilot Burner Malfunction Main Burner Malfunctions Electronic Thermostat Controller Calibration Service Hotline