Frymaster 35, 45 manual General Pilot Ignition, Electronic Ignition

Page 6

PERFORMANCE PRO SERIES GAS FRYERS MODELS 35 & 45

CHAPTER 1: SERVICE PROCEDURES

1.1 General

Performance Pro Series gas fryers (formerly Master Jet 35- and 45-series fryers) contain a welded stainless steel frypot directly heated by gas flames diffused evenly over its lower surface by ceramic targets. The flames originate from orifices in a U-shaped burner manifold positioned beneath the frypot. They are equipped with either a millivolt gas valve or electromechanical gas valve that regulates gas flow to the manifold. For operating information, refer to the Performance Pro Series Gas Fryers Models 35 & 45 Installation and Operation manual (P/N 819-6042). (Furthermore, referred to as the Installation and Operation manual.)

1.1.1 Pilot Ignition

The pilot system is the pilot orifice, pilot hood, and thermopile. The pilot serves two purposes: lighting the burners and heating the thermopile. In operation, the thermopile is in contact with the pilot flame and generates millivolts. The millivolt output passes through a normally closed high-limit switch and energizes the gas valve pilot coil, which opens the pilot valve. If the pilot flame is extinguished, the gas valve pilot coil loses voltage and the pilot valve closes.

In units equipped with 24-volt electromechanical gas valves, a separate 24-volt circuit activated by the fryer power switch provides voltage through the thermostat or controller to the gas valve main coil, which opens the main valve. The main gas valve will not open if the pilot valve is not open. Light the pilot flame manually using a match or the optional built-in piezo ignitor after installing the fryer.

1.1.2 Electronic Ignition

In units configured for electronic ignition, an ignition module connected to an ignitor assembly replaces the pilot system. The ignition module performs three important functions: supply voltage to the gas valve, provide an ignition spark, and proof the pilot flame. The module contains a 4-second time delay circuit and a coil that activates the gas valve. The ignitor assembly consists of a spark plug, a pilot, and a flame sensor element.

At start-up the power switch is placed in the ON position, supplying 12 VDC to the heat control circuitry in the controller or computer and to one side of the heat relay coil on the interface board. If resistance in the temperature probe indicates the temperature in the frypot is below 180°F (82°C), the current flows through a melt cycle circuit where a timer switch alternately closes for 3 seconds and opens for 24 seconds. If the temperature is 180°F (82°C) or above, the current flows through a heat circuit, bypassing the timer switch. In either case, current is supplied to the other leg of the heat relay coil, which closes an electronic switch in the 24 VAC circuit to provide current to the ignition module.

Circuitry in the ignition module sends 24 VAC current to the gas valve via a normally closed high-limit switch and a drain safety switch. Simultaneously, the module causes the ignitor to spark for 4 seconds to light the pilot flame. A flame sensor verifies that the pilot is lit by measuring the flow of microamps through the flame. If the pilot does not light or is extinguished, current to the ignition module is stopped, preventing the main valve from opening, and the ignition module locks out until the power switch is turned OFF, then back ON.

1-1

Image 6
Contents Hour Service Hotline Performance Pro Series Gas Fryers Models 35Canada Page Table of Contents Service Procedures Performance PRO Series GAS Fryers Models 35Table of Contents Parts List General Pilot Ignition Electronic IgnitionThermostats and Temperature Probes Controller OptionsMoving the Fryer for Servicing After servicing is complete Diagnostic Procedures Cleaning the Gas Valve Vent TubeTo adjust burner gas pressure Checking the Burner Manifold Gas PressureSeries Non-CE Standard Burner Manifold Gas Pressures Fryers with thermostat access doors Adjusting the Pilot FlameAdjusting Burner Ceramic Target Spacing and Alignment Calibrating the ThermostatFryers with thermostat control panels Testing the Temperature Probe Stop screw Locking nut Setscrew Replacing the Temperature Probe Page Replacing Burner Ceramic Targets Replacing the Gas ValveReplacing the Pilot Assembly or Thermopile Replacing the FrypotPage Pilot Failure Troubleshooting and Problem IsolationTypical Problems No pilot flame Unreliable pilot flameGas Valve Gas and Electrical Power SuppliesElectronic Circuits Improper Burner FunctionInadequate Make-up Air Misdirected or Weak Pilot FlameClogged Burner Orifices Other Causes of PoppingFailure to Control at Setpoint Improper Temperature ControlMelt Cycle Gas Valve MalfunctionSensitivity and Recovery Common Computer ComplaintsFiltration Malfunction There are three basket lift problem types. They are LeakageBasket Lift Malfunction Binds and Jams Motor and Gear WearElectronics Failure Manual Push-Button Modular Basket Lift Simplified Schematic Probe Resistance Chart Interpretation of Analog Controller LightsTroubleshooting Guides Problem Probable CausesTroubleshooting the Gas Valve Troubleshooting the ThermostatTroubleshooting the Temperature Probe Wiring Diagrams 1.8.1 Standing Pilot Electronic Ignition Non-Computer Controlled Fryer Filter Box Modular Basket Lift 100/120V Modular Basket Lift 208/250V Performance PRO Series GAS Fryers Models 35 Parts List Accessories100-120V Configuration Basket Lift and Associated PartsBasket Lift Assemblies Cabinetry 1 FPP/FMP Model Cabinetry Rear of fryer Four station fryer shownBrace, Top Cabinet Cabinet Assemblies see SectionBase Assemblies Back Panels, LowerPMJ Non-filter Model Cabinetry Cabinet Assemblies Back Panels, SingleOther Components Casters, Legs, and Associated Hardware LegsCasters Component Boxes Component Boxes without Melt Cycle Complete Box Assemblies ComponentsComponent Boxes with Melt Cycle Cover, Component Box Hole see illustration on Component Boxes with Standing Pilot 106-4084 Component Boxes with Electronic Ignition Cable, Ignition used with MJ45 ignition cable kit Control Panel Assemblies, Flue Caps, and Related Items Control Panel Assembly with Thermostat Access Door MJ Controller Assemblies ComponentWiring ASSEMBLIES, HARNESSES, and Remote Cable Assemblies Door Assembly 106-3965Door AssemblyDrain System Components 2.9.1 Drain Tube System Drain TubesMiscellaneous Drain Valves FPP/FMP Models Drain Safety Switch Drain Valve AssembliesDrain Valves Drain Valves PMJ Models Filter Boxes 120V see also Filter Pan Assembly Pan Assembly, Complete IncludesOther Filter Components Frypots Frypot Assemblies without InsulationFrypot Assemblies Complete Frypot Cabinetry 13.1 MJ45 Frypot Cabinetry 13.2 MJ35 Frypot Cabinetry Gas Valves and Burners 14.1 MJ45 Gas Valves and Burners ComponentPilot Assemblies, Non-CE 14.2 MJ35 Gas Valves and Burners Gas Valves, Non-CE see note below Oil Return Components Oil Return Components on next Power Shower Power Shower AssemblyThermostats and Timers Operating Thermostat Assembly, FenwallWiring Harnesses, Pin Terminals, and Power Cords ConnectorsGarland Range S35 Parts CabinetryService Hotline