Bloomfield 0420 owner manual PLUMBER’S Installation Instructions

Page 7

PLUMBER’S INSTALLATION INSTRUCTIONS

Brewer should be connected to a POTABLE WATER, COLD WATER line. Flush water line before connecting to Brewer.

DO NOT use a saddle valve with a self-piercing tap for the water line connection. Such a tap can become restricted by waterline debris. For systems that must use a saddle tap, shut off the main water supply and drill a 3/16” (minimum) tap for the saddle connection, in order to insure an ample water supply. Remember to flush the line prior to installing the saddle.

The brewer must be installed on a water line with average pressure between 20 PSI and 90 PSI. If your water pressure exceeds 90 PSI at anytime, a pressure regulator must be installed in the water supply line to limit the pressure to not more than 90 PSI in order to avoid damage to lines and solenoid.

A water shut-off valve should be installed on the incoming water line in a convenient location (Use a low restriction type valve, such as a 1/4-turn ball valve, to avoid loss of water flow thru the valve.

NSF requires that the brewer be able to be moved for cleaning underneath. Loops of copper tubing will satisfy this requirement. See Figure 2 below.

Fig. 2 Water Supply Installation

In some areas, local codes require a backflow preventer (check valve) to be installed on the inlet water line. If a backflow preventer is used, you must install a water hammer arrester in the incoming line, between the backflow preventer and the brewer inlet, as far away from the brewer as space will allow. This will relieve the excessive back pressures that can cause faucet leaks and solenoid malfunctions.

INSTALLATION (continued)

CAUTION:

ELECTRICAL

DAMAGE

DO NOT plug in or energize this appliance until all Installation Instructions are read and followed. Damage to the Brewer will occur if these instructions are not followed.

NOTE: Water supply inlet line must meet certain minimum criteria to insure successful operation of the brewer. Bloomfield recommends 1/4" copper tubing for installation of less than 12 feet and 3/8" for more than 12 feet from a 1/2" water supply line.

NOTE: This equipment must be installed to comply with applicable federal, state and local plumbing codes and ordinances.

IMPORTANT:

Water pressure must be between 20 p.s.i and 90 p.s.i. flowing pressure. If water pressure exceeds this value, or if water pressure varies greatly, a pressure regulator must be installed in the water supply line.

5

Image 7
Contents 686 Warranty Statement Specifications Table of ContentsApplicability Features and Operating Controls Automatic Brewers Burn Hazard Precautions and General InformationAgency Listing Information Electrical DamageLeveling the Unit InstallationUnstable Equipment Hazard PLUMBER’S Installation Instructions InstallationShock Hazard ELECTRICIAN’S Installation InstructionsSTART-UP OperationOperation Program Brew VolumesPreparation Operation Brewing CoffeePrepare for Next Brew Procedure Clean Coffee Brewer Cleaning InstructionsSymptom Possible Cause Suggested Remedy Troubleshooting SuggestionsServicing Instructions Access PanelsServicing Instructions Temperature AdjustmentReplace Thermostat Cotherm Remove Tank LID AssemblyReplace Heating Element Replace Solenoid Clean Solenoid ScreenReplace Controller Chemical Burn Hazard Procedure Delime the Water TankCabinet & Electrical Components Exploded View & Parts ListPlumbing Components Service Parts Kits Wiring Diagram Telephone Fax

0420 specifications

Bloomfield 0420 is a cutting-edge technology that has gained considerable attention in various sectors, including telecommunications, smart cities, and environmental monitoring. Positioned as a versatile platform, it offers robust features designed to enhance connectivity and facilitate data-driven decision-making.

One of the main features of Bloomfield 0420 is its advanced communication protocol. This protocol ensures seamless integration with various devices, making it an ideal choice for IoT (Internet of Things) applications. With its capability to support low-power wide-area networks (LPWAN), Bloomfield 0420 allows for long-range communication while minimizing energy consumption. This is especially beneficial for devices deployed in remote or hard-to-reach locations, where battery life is critical.

In addition, Bloomfield 0420 utilizes state-of-the-art sensor technologies to gather real-time data across diverse environments. This includes environmental sensors, which can monitor air quality, temperature, humidity, and other vital parameters. The data collected is not only used for monitoring purposes but can also trigger automated responses, allowing for timely interventions and improving overall efficiency.

Another hallmark of Bloomfield 0420 is its adaptability. The platform is engineered to support various applications, ranging from smart agriculture to urban infrastructure. For instance, in agriculture, it can optimize irrigation systems by analyzing soil moisture levels and weather patterns. In urban settings, it can assist in traffic management and public safety by providing insights into crowd density and movement.

Security is paramount in the design of Bloomfield 0420. The technology incorporates advanced encryption methodologies and secure communication channels to protect sensitive data. This ensures that information transmitted between devices and data centers remains confidential and secure from potential cyber threats.

In conclusion, Bloomfield 0420 represents a significant advancement in the technology landscape, combining robust communication capabilities, intelligent data collection, adaptability across sectors, and strong security measures. Its innovative approach is set to empower industries to harness the full potential of data, drive efficiency, and foster sustainable practices, positioning it as a key player in the future of technology and connectivity. As more sectors look to integrate such technology, Bloomfield 0420 is poised to play a critical role in shaping the smart ecosystems of tomorrow.