INITIAL FILL (Continued)
7.Turn ON the refrigeration switch at the back of the dispenser. This will start the water bath pump circula- tion.
8.Check water level in the overflow tube and top off the tank if necessary (Step 5).
9.Disconnect the fill tube and allow excess water to drain into the drip tray. Replace the plug in the end of the fill tube and store back into the dispenser.
10.Place the Dispense Lockout switch back to the ON position.
11.Replace the splash panel and drip tray.
12.It will take several hours to create the ice bank required for full dispenser performance. During this time, some further trickling from the water bath is expected due to expansion caused by ice bank formation. While the refrigeration system is creating the ice bank, the dispenser may be readied for use as described in Loading, Priming and Adjustment.
P3582 | P3842 |
FIG 5 Initial Fill Connection - | FIG 6 Initial Fill Connection - |
39992 042007