SERVICE (cont.)

Grinders with One or Two Brewer Optional Interface

Weigh Control Board - WDG-2 (cont.)

8.Disconnect grinder from the power source.

If voltage is present as described, proceed to #9.

If voltage is not present as described, refer to the wir- ing diagram and check the grinder wiring harness.

9.Check the voltage between J4-3 and J4-5 with a voltmeter when the "OFF/ON/START" is in the "START" position. Connect grinder to the power source. The indication must be 120 volts AC.

10.Disconnect grinder from the power source.

If voltage is present as described, proceed to #11. If voltage is not present as described, replace weigh control board.

11.Reconnect the wires.

12.Place the hopper selector in the right position.

13.Repeat steps #4 thru 10.

1.Set the brewer selector switch on one third batch with grinder "OFF/ON/START" switch in the "ON" position.

2.Select the two third's batch, if the readout is not different then adjust the settings and return se- lector switch to one third batch. The readout should now be different.

3.Select full batch, if the readout is not different then adjust the settings and return selector switch to two third's batch. The readout should be dif- ferent.

4.Repeat steps 1 thru 3 for the opposite side. NOTE: Each brew selection has its own readout. If readouts do not differ with each brew selection after adjusting settings, check interface cable. If interface cable is ok replace weigh control board.

Removal and Replacement:

1.Separate the grinder wiring harness connectors from the weigh control board.

2.Refer to the illustration below when re- attach- ing the connectors.

3.Refer to the Adjustments (page 7) section to re- set the volume dispensed.

VIO TO SELECTOR SWITCH

WHI TO POWER CORD

BLK TO FUSE HOLDER

5 1 6 2 7 3 8 4

J4

WHI TO MOTOR CIRCUIT BOARD

 

 

ORA TO OFF/ON/START SWITCH

J1

6 1 7 2 8 3 94 105

ORA TO OFF/ON/START SWITCH

 

 

 

TAN TO INTERFACE CONNECTOR

 

 

GRY TO INTERFACE CONNECTOR

 

 

BLK TO GRINDING LED

 

 

PNK TO INTERFACE CONNECTOR

 

RED TO OFF/ON/START SWITCH

YEL TO SELECTOR SWITCH

GRN TO OPTIONAL MULTISET SWITCH

TAN TO OPTIONAL INTERFACE CONNECTOR

GRY TO OPTIONAL INTERFACE CONNECTOR

J5

DIGITAL CONTROL DISPLAY

ASSEMBLY CORD CONNECTION

GRY TO WEIGH CONTROL ASSEMBLY

BLK TO WEIGH CONTROL ASSEMBLY

J3

3 1 4 2

RED TO WEIGH CONTROL ASSEMBLY

ORA TO WEIGH CONTROL ASSEMBLY

P930

21

10854 030300

 

Image 21
Contents BUNNDG-2 Contents User Notices #05876.0000#20545.0000 Hopper Selector Switch Off/On/Start SwitchDispense Timer DG-2 Electrical RequirementsWDG-2 Initial SET-UP DG-2 Initial SET-UPSpecial SET-UP for Flavored Coffee Beans 10854 Coffee Grinding CleaningAdjustments Burr AdjustmentTimer Adjustment DG-2 Coffee Weight/Timer Settings Problem Probable Cause Grinder will not start TroubleshootingRemedy ProblemWDG-2 Digital Display Control Fault Codes Problem Component Access ServiceService Bunn MotorsMotor Motor Circuit Assembly Timer DG-2Replace if excessively worn or damaged Disconnect grinder from the power source Weigh Control Board WDG-2 P930 10854 Fuse FanWeigh Control Assembly WDG-2 Funnel Rails Mounting Bracket Service 60 HZ Wiring Diagrams Schematic Wiring Diagram DG2Wiring Diagrams Schematic Wiring Diagram WDG2