Bunn WDG-2 manual Service

Page 25

SERVICE (cont.)

Weigh Control Assembly - WDG-2 (cont.)

Removal and Replacement

1.Disconnect grinder from the power source.

2.Remove the four #6-32 truss head screws se- curing lower front inspection panel (1). Remove panel with digital control display assembly at- tached.

3.Remove the one #6-32 truss head screw secur- ing the weigh control board mounting bracket

(2)to the weigh assembly mounting bracket (3).

4.Slide weigh control board mounting bracket and control board (2) out of weigh assembly mount- ing bracket (3) far enough so the connectors on the grinders main wiring harness and the con- nector on the weight assembly leads can be dis- connected.

5.Disconnect connectors.

6.Remove weigh control board mounting bracket and weigh control board (2) from the grinder.

7.Remove the two #10-32 slotted head screws securing weigh control mounting bracket (3) to the base of the grinder and the two #10-32 keps nuts securing the weigh control mounting bracket (3) to the rear of the grinder housing.

8.Slide weigh control mounting bracket (3) from grinder housing far enough to have access to weigh control assembly (4).

9.Holding pivot arm w/overload assembly (5) up remove the four #8-32 pan head screws secur- ing weigh control assembly (4). Remove and dis- card weigh control assembly (4).

10.Holding pivot arm w/overload assembly (5) up install the new weigh control assembly (4) to the mounting bracket (3) using four #8-32 pan head screws.

11.Slide weigh control assembly mounting bracket

(3)on to the two studs on the rear of the grinder housing and secure with two #10-32 keps nuts.

NOTE - Carefully guide all wires while installing the weigh mechanism. The funnel tab (7) on the fun- nel rails mounting bracket (6) must be in clear- ance slot (8) in the grinder housing and must move freely up and down.

12.Secure weigh control assembly mounting bracket

(3) to grinder base with two #10-32 slotted head screws.

13.Slide the weigh control bracket and weigh con- trol board (2) into the weigh control mounting bracket (3) far enough to reconnect the eight and ten pin connectors from the main wiring harness and the four pin connector from the weigh con- trol assembly. Connect the wiring.

14.Refer to the illustration on page 19 when reat- taching the connectors.

NOTE - Inspect for pinched wires.

15.Slide weigh control bracket and weigh control board (2) the rest of the way into the weigh con- trol mounting bracket (3) and secure with one #6-32 truss head screw.

16.Reinstall lower front inspection panel with digi- tal control display assembly attached using four #6-32 truss head screws.

17.Connect the grinder to the power source and fol- low the function list on page 8 for information on setting the weight to be ground.

25

10854 030300

 

Image 25
Contents BUNNDG-2 Contents #05876.0000 User Notices#20545.0000 Hopper Selector Switch Off/On/Start SwitchDispense Timer DG-2 Electrical RequirementsWDG-2 Initial SET-UP DG-2 Initial SET-UPSpecial SET-UP for Flavored Coffee Beans 10854 Coffee Grinding CleaningBurr Adjustment AdjustmentsTimer Adjustment DG-2 Coffee Weight/Timer Settings Problem Probable Cause Grinder will not start TroubleshootingRemedy ProblemWDG-2 Digital Display Control Fault Codes Problem Component Access ServiceService Bunn MotorsMotor Timer DG-2 Motor Circuit AssemblyReplace if excessively worn or damaged Disconnect grinder from the power source Weigh Control Board WDG-2 P930 10854 Fuse FanWeigh Control Assembly WDG-2 Funnel Rails Mounting Bracket Service 60 HZ Wiring Diagrams Schematic Wiring Diagram DG2Wiring Diagrams Schematic Wiring Diagram WDG2