Bunn manual WDG-2 Initial SET-UP

Page 5

DG-2 INITIAL SET-UP

1.WARNING - Unplug grinder before removal of any panel.

2.Read NOTICE attached to upper front inspection panel.

3.Remove upper front inspection panel located below control switches and the rear panel.

4.Remove shipping bracket, materials and discard.

5.Reinstall upper front inspection panel and rear panel.

6.Open the top lid(s). Clear all foreign objects and shipping material from the hopper compartments and the entrance to the grind chambers.

7.Remove the lower front inspection panel.

8.Plug-in the grinder.

9.Select either the left or right hopper with the selector switch. Do not press the start switch.

10.The dispense timer panel readout will indicate the present timer setting in seconds and will remain displayed for five minutes.

11.Increase or decrease the timer setting to obtain the desired amount of cof- fee for the hopper selected by pressing the appropriate button (+ or –).

12.Repeat steps 9 thru 11 for the other hopper. The display will go out on its own. Reinstall lower front inspection panel.

13.Fill the hopper compartments with whole bean coffee. (Capacity 6 pounds each). The grinder is now ready for use.

WDG-2 INITIAL SET-UP

1.WARNING - Unplug grinder before removal of any panel.

2.Read NOTICE attached to the upper front inspection panel.

3.Remove upper front inspection panel located below control switches and the rear panel.

4.Remove shipping bracket, materials and discard.

5.Reinstall upper front inspection panel and rear panel.

6.Open the top lid(s). Clear all foreign objects and shipping material from the hopper compartments and the entrance to the grind chambers.

7.Remove the four screws securing the lower front inspection panel and care- fully pull out far enough to view and operate the digital control display assembly.

8.Plug-in the grinder.

9.Select either the left or right hopper with the selector switch. Do not press the start switch.

10.The digital control display assembly screen displays selected weight when idle. When grinding - display resets to 0.00 and shows increasing weight. Display shows final weight for ten seconds and returns to selected weight.

11.Use (+) or (-) buttons and left or right hopper selector switch to set selected weights, .50 oz minimum - 16 oz maximum.

NOTE: Refer to function list on page 8 for recalibration of weigh control assembly if necessary.

5

DISPENSE TIME (Seconds)

I 0.0

 

DISPLAY

Increase

Decrease

+

 

Readout will be displayed for 5 minutes.

Timer can only be adjusted while readout is displayed.

WARNING

HAZARDOUS VOLTAGE

UNPLUG GRINDER

BEFORE REMOVING!

 

P734

N O T I C E

 

The Shipping Bracket and

 

All Packing Material

 

Behind This Panel

 

MUST be Discarded

 

Before Using Grinder!

 

NOTICE

BUNN

For connection to Bunn-Omatic

Coffee Brewer Models:

Dual, OT, Single, & System III only.

(24 volt N.E.C. Class 2 circuit only.)

 

P928

-

+

FUNC

-

+

FU

NC

P927

P927

10854 030300

Image 5
Contents BUNNDG-2 Contents #20545.0000 User Notices#05876.0000 Hopper Selector Switch Off/On/Start SwitchDispense Timer DG-2 Electrical RequirementsWDG-2 Initial SET-UP DG-2 Initial SET-UPSpecial SET-UP for Flavored Coffee Beans 10854 Coffee Grinding CleaningTimer Adjustment DG-2 AdjustmentsBurr Adjustment Coffee Weight/Timer Settings Problem Probable Cause Grinder will not start TroubleshootingRemedy ProblemWDG-2 Digital Display Control Fault Codes Problem Component Access ServiceService Bunn MotorsMotor Replace if excessively worn or damaged Motor Circuit AssemblyTimer DG-2 Disconnect grinder from the power source Weigh Control Board WDG-2 P930 10854 Fuse FanWeigh Control Assembly WDG-2 Funnel Rails Mounting Bracket Service 60 HZ Wiring Diagrams Schematic Wiring Diagram DG2Wiring Diagrams Schematic Wiring Diagram WDG2