Bunn 40410.0000G service manual Draining Tank

Page 15

DRAINING TANK

1.Unplug the brewer and let it cool down before proceeding.

2.Remove the brew funnel.

3.Remove the front cover.

4.Pinch fill hose.

5.Loosen clamp from fill solenoid..

6.Remove hose from solenoid and drain into sink as shown (or 2 gallon bucket).

7.After draining, reinstall hose and clamp. (Hand tighten only).

FIG 14

Page 15

40410

092407

 

Image 15
Contents Series BUNN-O-MATIC Commercial Product Warranty Contents IntroductionUser Notices 120 & 230 volt ac models Electrical RequirementsCE Requirements Volt CE Model 120/240 Volt ModelPlumbing Hook-Up Plumbing RequirementsInitial SET UP Do not USE Faucet During Brew Cycle Coffee BrewingOperating Controls Silver Series Enable Brew ON/OFF SwitchSmall Brew Switch Large Brew SwitchOptional Pulse Brew SET-UP Brew Volume SET-UPRestore Factory Defaults Programming Silver SeriesDEA B C Brew a SwitchBrew B Switch + Operating Controls Smart Wave with DisplayTechnician SET-UP U7 Factory Adjustments Do notProgramming Smart Wave with Display Advanced SET-UPDeliming Cleaning Optional Large Sprayhead CleaningTop Cover Cover RemovalDraining Tank Switch Settings Program SwitchesKEY # Function OFF Function on Display Description Action TroubleshootingSingle Phase Wire + GNDSchematic Wiring Diagram Schematic Wiring Diagram Wave 15 APS, 15 S APS