Bunn 40410.0000G service manual Cover Removal, Top Cover

Page 14

COVER REMOVAL

Unplug the brewer and let it cool down before proceeding.

Front Wrap:

1.Remove the brew funnel.

2.Remove upper and lower screws on either side of front cover.

3.Loosen middle screw on either side of front cover.

4.Pull front cover towards front of brewer.

Top Cover:

REMOVE

1. Remove both screws.

 

2.Lift top cover to clear front tabs.

REMOVE

REMOVE

LOOSEN

REMOVE

FIG 13

Page 14

40410

092407

 

Image 14
Contents Series BUNN-O-MATIC Commercial Product Warranty User Notices ContentsIntroduction Volt CE Model 120/240 Volt Model Electrical RequirementsCE Requirements 120 & 230 volt ac modelsPlumbing Requirements Plumbing Hook-UpInitial SET UP Coffee Brewing Do not USE Faucet During Brew CycleLarge Brew Switch Enable Brew ON/OFF SwitchSmall Brew Switch Operating Controls Silver SeriesProgramming Silver Series Brew Volume SET-UPRestore Factory Defaults Optional Pulse Brew SET-UPOperating Controls Smart Wave with Display Brew a SwitchBrew B Switch + DEA B CAdvanced SET-UP U7 Factory Adjustments Do notProgramming Smart Wave with Display Technician SET-UPDeliming Cleaning Cleaning Optional Large SprayheadCover Removal Top CoverDraining Tank KEY # Function OFF Function on Switch SettingsProgram Switches Troubleshooting Display Description ActionWire + GND Single PhaseSchematic Wiring Diagram Schematic Wiring Diagram Wave 15 APS, 15 S APS