Bunn JDF-2N manual Contents

Page 2

CONTENTS

 

Introduction & Warranty

2

User Notices

3

Initial Set-Up & Electrical Requirements

4

Plumbing Requirements

4

Operating Controls

7

Initial Fill

5

Dispenser Use

9

Cleaning

10

Adjustments & Optional Settings

13

Function Lists

18

Troubleshooting

21

Coolant Diagram

28

Schematic Wiring Diagram

29

BUNN-O-MATIC COMMERCIAL PRODUCT WARRANTY

 

Bunn-O-Matic Corp. (“BUNN”) warrants equipment manufactured by it as follows:

1)All equipment other than as specified below: 2 years parts and 1 year labor.

2)Electronic circuit and/or control boards: parts and labor for 3 years.

3)Compressors on refrigeration equipment: 5 years parts and 1 year labor.

4)Grinding burrs on coffee grinding equipment to grind coffee to meet original factory screen sieve analysis: parts and labor for 3 years or 30,000 pounds of coffee, whichever comes first.

These warranty periods run from the date of installation BUNN warrants that the equipment manufactured by it will be commercially free of defects in material and workmanship existing at the time of manufacture and appearing within the applicable warranty period. This warranty does not apply to any equipment, component or part that was not manufactured by BUNN or that, in BUNN’s judgment, has been affected by misuse, neglect, alteration, improper installation or operation, improper maintenance or repair, damage or casualty. This warranty is conditioned on the Buyer 1) giving BUNN prompt notice of any claim to be made under this warranty by telephone at (217) 529-6601 or by writing to Post Office Box 3227, Springfield, Illinois 62708-3227; 2) if requested by BUNN, shipping the defective equipment prepaid to an authorized BUNN service location; and 3) receiving prior authorization from BUNN that the defective equipment is under warranty.

THE FOREGOING WARRANTY IS EXCLUSIVE AND IS IN LIEU OF ANY OTHER WARRANTY, WRITTEN OR ORAL, EXPRESS OR IMPLIED, INCLUDING, BUT NOT LIMITED TO, ANY IMPLIED WARRANTY OF EITHER MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE. The agents, dealers or employees of BUNN are not authorized to make modifications to this warranty or to make additional warranties that are binding on BUNN. Accordingly, statements by such individuals, whether oral or written, do not constitute warranties and should not be relied upon.

If BUNN determines in its sole discretion that the equipment does not conform to the warranty, BUNN, at its exclusive option while the equipment is under warranty, shall either 1) provide at no charge replacement parts and/or labor (during the applicable parts and labor warranty periods specified above) to repair the defective components, provided that this repair is done by a BUNN Authorized Service Representative; or 2) shall replace the equipment or refund the purchase price for the equipment.

THE BUYER’S REMEDY AGAINST BUNN FOR THE BREACH OF ANY OBLIGATION ARISING OUT OF THE SALE OF THIS EQUIPMENT, WHETHER DERIVED FROM WARRANTY OR OTHERWISE, SHALL BE LIMITED, AT BUNN’S SOLE OPTION AS SPECIFIED HEREIN, TO REPAIR, REPLACEMENT OR REFUND.

In no event shall BUNN be liable for any other damage or loss, including, but not limited to, lost profits, lost sales, loss of use of equipment, claims of Buyer’s customers, cost of capital, cost of down time, cost of substitute equipment, facilities or services, or any other special, incidental or consequential damages.

BUNN, and JDF-2 are either trademarks or registered trademarks of Bunn-O-Matic Corporation.

38310 010406

Image 2
Contents Post Office BOX SPRINGFIELD, Illinois Phone 217 529-6601 FAX 217Contents User Notices Plumbing Requirements Initial SET-UPElectrical Requirements Electrical HOOK-UPInitial Fill Initial Fill ConnectionPlumbing Hookup LoadingPriming Frozen ConcentratesSanitize Switch Refrigeration SwitchRefrigeration Switch Operating ControlsOperating Controls Portion Control Models Refer to Fig Dispenser USEPress and Hold Models Refer to Fig Weekly Sanitizing Cleaning & Preventive MaintenanceDaily Parts Washing Cleaning Cleaning Monthly Clean Condenser Air Filter Annually Replace Pump TubingAdjustment & Optional Settings Temperature Compensated Refractometer MethodPer 3-second test Mix RatioProduct Brix % Adjustment & Optional Settings Pump Speed Programming Cup Size Programming Portion Control Dispensers OnlyAdjustment & Optional Settings Dispenser Lockout Service LockoutAdjustment & Optional Settings Password ProtectionCooling Fault List Dispense Fault ListBeeper Fault DBC display FaultControls Off Dip Switch Function ListRefill indicator when concentrate out is detected Audio feedback during dispensesFunction List Access bath fill valve and top off bath tank TroubleshootingProblem Probable Cause All water LEDs flashCooling system failure or DBC fault TroubleshootingProblem RemedyRefill LED not extinguishing Bottle adapter switch mem- braneDispense touchpad All stations dispense concentrate Main water supply OnlyWater only Problem Probable Cause RemedyConcentrate only Password Initial fill/setupCant access programming Programming password feature Nect fittingsOnce water is set, adjust motor Fault codesIs powered from the step-down Step-down transformerUse of portable water pump Difficulty brixing and/or weak bev Pump tubing ErageStation Difficulty brixing bag-in-boxCoolant Schematic Diagram Schematic Wiring Diagram Schematic Wiring Diagram Schematic Wiring Diagram JDF-2 Control Panel Circuit Schematic Wiring Diagram JDF-2 Remaining Circuits

JDF-2N specifications

The Bunn JDF-2N is a high-performance coffee brewing system that has gained popularity among coffee enthusiasts and professionals for its innovative features and exceptional brewing capabilities. Designed with user convenience and operational efficiency in mind, this machine is ideal for cafes, restaurants, and various other commercial settings.

One of the standout features of the Bunn JDF-2N is its dual brewing capability. It allows for simultaneous brewing of two distinct coffee batches, accommodating high demand and ensuring that customers receive fresh coffee promptly. This feature is particularly advantageous in busy environments, where quick service is essential to maintain customer satisfaction.

The brewing technology employed in the JDF-2N is designed to optimize extraction and flavor. The machine utilizes a precisely controlled spray head that saturates coffee grounds evenly, allowing for a consistent extraction process. This results in a rich, flavorful coffee that highlights the unique characteristics of each coffee blend. Additionally, the machine is equipped with a large-capacity water reservoir, which guarantees a steady flow of hot water, further enhancing brewing efficiency.

Another notable characteristic of the Bunn JDF-2N is its intuitive digital control panel. This user-friendly interface allows baristas and operators to easily adjust brewing parameters, such as brew temperature and time, tailoring the process to specific coffee types or personal preferences. The programmable features enable users to save their favorite settings, ensuring a consistent coffee experience with every brew.

The build quality of the Bunn JDF-2N is robust, featuring durable stainless steel construction that not only maintains aesthetic appeal but also ensures longevity. The machine is designed with serviceability in mind, allowing for easy access to components for maintenance and repairs.

Moreover, the Bunn JDF-2N is equipped with an innovative hot water faucet, offering immediate access to hot water for tea, soup, or other hot beverages, further enhancing its versatility in a commercial setting.

In summary, the Bunn JDF-2N stands out with its dual brewing functionality, advanced extraction technology, user-friendly interface, and durable construction. It represents an ideal solution for businesses that prioritize quality, efficiency, and customer satisfaction in their coffee offerings. With its array of features and reliable performance, the Bunn JDF-2N is a noteworthy choice for any establishment looking to elevate its coffee service.