Bunn JDF-2N manual Initial Fill Connection

Page 5

PLUMBING REQUIREMENTS (cont)

NOTE- At least 18 inches (457 mm) of an FDA approved flexible beverage tubing, such as reinforced braided polyethylene, before the dispenser will facilitate movement to clean the countertop. It can be purchased direct from BUNN-O-MATIC (part number 34325.10_ _ [see Illustrated Parts Catalog for complete part number.]) BUNN-O-MATIC does not recommend the use of saddle valves to install the dispenser. The size and shape of the hole(s) made in the supply line(s) by saddle valves may restrict water flow.

Note- A water strainer (Bunn-O-Matic part number 23720.1000) should be installed in line, prior to the flex- ible water line. This strainer is supplied loose with the dispenser. (See Fig. 2 for proper locations)

This equipment must be installed to comply with the Basic Plumbing Code of the Building Officials and Code Administrators International, Inc. (BOCA) and the Food Service Sanitation Manual of the Food and Drug Administration (FDA). For models installed outside the U.S.A., you must comply with the applicable Plumbing/Sanitation Code for your area.

INITIAL FILL

CAUTION: The dispenser must be disconnected from the power source throughout the initial fill except when specified in the instructions.

1.Remove drip tray assembly and splash panel from the dispenser.

2.Pull the overflow tube from its retaining clip and connect it to the main water source (black gasket is supplied in install kit).

3.Connect dispenser to the power source.

4.Slowly open the water shut off valve and fill the water bath until water trickles from the overflow. The dispenser will beep for three seconds when bath is approaching full. Reduce the flow rate at this time.

5.After 3 minutes of power, slowly add more water to the tank until water trickles from overflow again.

6.Once water bath is filled, remove water source, cap dispenser fill line, and store the fill tube in it’s holder (the fill tube can now be used as a sight glass).

7.Replace the splash panel and drip tray.

8.Place refrigeration switch to the “ON” position. It will take approximately three hours at 75° F (24° C) ambient to create the ice bank required for full dispenser performance. During this time, some further trickling from the water bath is expected due to expansion caused by ice bank formation. While the refrigeration system is creating the ice bank, the dispenser may be readied for use as described in Plumbing, Loading, Priming and Adjustment.

P2655

FIG 1 Initial Fill Connection

38310 010406

Image 5
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisContents User Notices Electrical Requirements Initial SET-UPPlumbing Requirements Electrical HOOK-UPInitial Fill Connection Initial FillPriming LoadingPlumbing Hookup Frozen ConcentratesRefrigeration Switch Refrigeration SwitchSanitize Switch Operating ControlsOperating Controls Portion Control Models Refer to Fig Dispenser USEPress and Hold Models Refer to Fig Weekly Sanitizing Cleaning & Preventive MaintenanceDaily Parts Washing Cleaning Annually Replace Pump Tubing Cleaning Monthly Clean Condenser Air FilterTemperature Compensated Refractometer Method Adjustment & Optional SettingsPer 3-second test Mix RatioProduct Brix % Cup Size Programming Portion Control Dispensers Only Adjustment & Optional Settings Pump Speed ProgrammingService Lockout Adjustment & Optional Settings Dispenser LockoutPassword Protection Adjustment & Optional SettingsBeeper Fault Dispense Fault ListCooling Fault List DBC display FaultRefill indicator when concentrate out is detected Dip Switch Function ListControls Off Audio feedback during dispensesFunction List Problem Probable Cause TroubleshootingAccess bath fill valve and top off bath tank All water LEDs flashProblem TroubleshootingCooling system failure or DBC fault RemedyDispense touchpad Bottle adapter switch mem- braneRefill LED not extinguishing All stations dispense concentrate Main water supply OnlyWater only Problem Probable Cause RemedyConcentrate only Cant access programming Programming password feature Initial fill/setupPassword Nect fittingsIs powered from the step-down Fault codesOnce water is set, adjust motor Step-down transformerStation Difficulty brixing and/or weak bev Pump tubing ErageUse of portable water pump Difficulty brixing bag-in-boxCoolant Schematic Diagram Schematic Wiring Diagram Schematic Wiring Diagram Schematic Wiring Diagram JDF-2 Control Panel Circuit Schematic Wiring Diagram JDF-2 Remaining Circuits

JDF-2N specifications

The Bunn JDF-2N is a high-performance coffee brewing system that has gained popularity among coffee enthusiasts and professionals for its innovative features and exceptional brewing capabilities. Designed with user convenience and operational efficiency in mind, this machine is ideal for cafes, restaurants, and various other commercial settings.

One of the standout features of the Bunn JDF-2N is its dual brewing capability. It allows for simultaneous brewing of two distinct coffee batches, accommodating high demand and ensuring that customers receive fresh coffee promptly. This feature is particularly advantageous in busy environments, where quick service is essential to maintain customer satisfaction.

The brewing technology employed in the JDF-2N is designed to optimize extraction and flavor. The machine utilizes a precisely controlled spray head that saturates coffee grounds evenly, allowing for a consistent extraction process. This results in a rich, flavorful coffee that highlights the unique characteristics of each coffee blend. Additionally, the machine is equipped with a large-capacity water reservoir, which guarantees a steady flow of hot water, further enhancing brewing efficiency.

Another notable characteristic of the Bunn JDF-2N is its intuitive digital control panel. This user-friendly interface allows baristas and operators to easily adjust brewing parameters, such as brew temperature and time, tailoring the process to specific coffee types or personal preferences. The programmable features enable users to save their favorite settings, ensuring a consistent coffee experience with every brew.

The build quality of the Bunn JDF-2N is robust, featuring durable stainless steel construction that not only maintains aesthetic appeal but also ensures longevity. The machine is designed with serviceability in mind, allowing for easy access to components for maintenance and repairs.

Moreover, the Bunn JDF-2N is equipped with an innovative hot water faucet, offering immediate access to hot water for tea, soup, or other hot beverages, further enhancing its versatility in a commercial setting.

In summary, the Bunn JDF-2N stands out with its dual brewing functionality, advanced extraction technology, user-friendly interface, and durable construction. It represents an ideal solution for businesses that prioritize quality, efficiency, and customer satisfaction in their coffee offerings. With its array of features and reliable performance, the Bunn JDF-2N is a noteworthy choice for any establishment looking to elevate its coffee service.