Bunn JDF-2N manual Adjustment & Optional Settings Pump Speed Programming

Page 15

ADJUSTMENT & OPTIONAL SETTINGS (cont)

Pump Speed Programming

1.Enter the “Pump Speed Programming” mode by simultaneously pressing both “Hidden Switches”. Note that the beeper sounds twice and that the “PROGRAM” indicator begins flashing.

2.To increase the pump speed, press and hold the right-hand “Hidden Switch” (filled circle) and then momen- tarily press the “Product Dispense Switch” Fig 5 (“+/STOP Switch” Fig 6, for portion control dispensers). Each time the “Product Dispense Switch “(+/STOP Switch”) is pressed, the motor speed is increased by one step (5 revolutions per minute [RPM].) Note that each step is confirmed by a single flash of the appropriate “REFILL” indicator and a single tone from the beeper.

3.To decrease the pump speed, press and hold the left-hand “Hidden Switch” (half-filled circle) and then mo- mentarily press the “Product Dispense Switch (“+/STOP Switch” for portion control dispensers). Each time the “Product Dispense” (“+/STOP”) Switch is pressed, the motor speed is decreased by one step (5 RPM.) Note that each step is confirmed by a single flash of the appropriate “REFILL” indicator and a single tone from the beeper.

4.Repeat as necessary at the remaining dispense stations.

5.Exit the “Pump Speed Programming” mode by simultaneously pressing both “Hidden Switches”. Note that the beeper sounds twice and that the “PROGRAM” indicator extinguishes.

NOTE: Dispense at least 12 oz. of finished product before dispensing a sample to check brix. This will allow the pump time to adjust to the new speed.

Cup Size Programming (Portion Control Dispensers Only)

1.Enter the “Cup Size Programming” mode by simultaneously pressing the “LARGE” and “SMALL” cup size switches at any dispense station. Note that the beeper sounds twice and that the “PROGRAM” indicator lights steadily.

2.Press and hold the desired cup size switch at the appropriate dispense position until the correct cup volume is achieved. Top up as necessary by momentarily pressing the same cup size switch. Note that if DIP switch #2 on the control board is set to the “on” position, concentrate must be present in order to dispense or program cup sizes.

3.Repeat as necessary for the remaining cup sizes and dispense stations.

4.Exit the “Cup Size Programming” mode by pressing any of the “+/STOP Switches”. Note that the beeper sounds twice and that the “PROGRAM” indicator extinguishes.

15

38310 092905

 

Image 15
Contents Phone 217 529-6601 FAX 217 Post Office BOX SPRINGFIELD, IllinoisContents User Notices Electrical HOOK-UP Initial SET-UPElectrical Requirements Plumbing RequirementsInitial Fill Connection Initial FillFrozen Concentrates LoadingPriming Plumbing HookupOperating Controls Refrigeration SwitchRefrigeration Switch Sanitize SwitchOperating Controls Dispenser USE Press and Hold Models Refer to FigPortion Control Models Refer to Fig Cleaning & Preventive Maintenance Daily Parts WashingWeekly Sanitizing Cleaning Annually Replace Pump Tubing Cleaning Monthly Clean Condenser Air FilterTemperature Compensated Refractometer Method Adjustment & Optional SettingsMix Ratio Product Brix %Per 3-second test Cup Size Programming Portion Control Dispensers Only Adjustment & Optional Settings Pump Speed ProgrammingService Lockout Adjustment & Optional Settings Dispenser LockoutPassword Protection Adjustment & Optional SettingsDBC display Fault Dispense Fault ListBeeper Fault Cooling Fault ListAudio feedback during dispenses Dip Switch Function ListRefill indicator when concentrate out is detected Controls OffFunction List All water LEDs flash TroubleshootingProblem Probable Cause Access bath fill valve and top off bath tankRemedy TroubleshootingProblem Cooling system failure or DBC faultAll stations dispense concentrate Main water supply Only Bottle adapter switch mem- braneDispense touchpad Refill LED not extinguishingProblem Probable Cause Remedy Concentrate onlyWater only Nect fittings Initial fill/setupCant access programming Programming password feature PasswordStep-down transformer Fault codesIs powered from the step-down Once water is set, adjust motorDifficulty brixing bag-in-box Difficulty brixing and/or weak bev Pump tubing ErageStation Use of portable water pumpCoolant Schematic Diagram Schematic Wiring Diagram Schematic Wiring Diagram Schematic Wiring Diagram JDF-2 Control Panel Circuit Schematic Wiring Diagram JDF-2 Remaining Circuits

JDF-2N specifications

The Bunn JDF-2N is a high-performance coffee brewing system that has gained popularity among coffee enthusiasts and professionals for its innovative features and exceptional brewing capabilities. Designed with user convenience and operational efficiency in mind, this machine is ideal for cafes, restaurants, and various other commercial settings.

One of the standout features of the Bunn JDF-2N is its dual brewing capability. It allows for simultaneous brewing of two distinct coffee batches, accommodating high demand and ensuring that customers receive fresh coffee promptly. This feature is particularly advantageous in busy environments, where quick service is essential to maintain customer satisfaction.

The brewing technology employed in the JDF-2N is designed to optimize extraction and flavor. The machine utilizes a precisely controlled spray head that saturates coffee grounds evenly, allowing for a consistent extraction process. This results in a rich, flavorful coffee that highlights the unique characteristics of each coffee blend. Additionally, the machine is equipped with a large-capacity water reservoir, which guarantees a steady flow of hot water, further enhancing brewing efficiency.

Another notable characteristic of the Bunn JDF-2N is its intuitive digital control panel. This user-friendly interface allows baristas and operators to easily adjust brewing parameters, such as brew temperature and time, tailoring the process to specific coffee types or personal preferences. The programmable features enable users to save their favorite settings, ensuring a consistent coffee experience with every brew.

The build quality of the Bunn JDF-2N is robust, featuring durable stainless steel construction that not only maintains aesthetic appeal but also ensures longevity. The machine is designed with serviceability in mind, allowing for easy access to components for maintenance and repairs.

Moreover, the Bunn JDF-2N is equipped with an innovative hot water faucet, offering immediate access to hot water for tea, soup, or other hot beverages, further enhancing its versatility in a commercial setting.

In summary, the Bunn JDF-2N stands out with its dual brewing functionality, advanced extraction technology, user-friendly interface, and durable construction. It represents an ideal solution for businesses that prioritize quality, efficiency, and customer satisfaction in their coffee offerings. With its array of features and reliable performance, the Bunn JDF-2N is a noteworthy choice for any establishment looking to elevate its coffee service.