Anetsberger Brothers CF14 warranty Fryer Electrical Specifications, Code Requirements

Page 4

FRYER ELECTRICAL SPECIFICATIONS

The ANETS Fryer Model CF14 requires no external electric power source.

Figure 1 is a wiring diagram of an ANETS CF14 Fryer. Some fryers

may have other options that do not appear in this basic wiring diagram. A model-specific wiring diagram included with each fryer shows all the actual parts and their associated wiring connections.

Figure 1. Fryer Model CF14 Wiring Diagram

CODE REQUIREMENTS

IMPORTANT: Read the Code Requirements and ALL installation instructions carefully, before starting the installation. Contact the factory if any problems or questions arise.

The fryer installation must conform with local codes, or in the absence of local codes, with the National Fuel Gas Code, ANSI Z223.1 (latest edition); the Natural Gas Installation Code, CAN/ CGA-B149.1 (latest edition); or the Propane Gas Installation Code, CAN/CGA-B149.2 (latest edition), as applicable, including:

a.Disconnect the fryer and its individual shutoff valve from the gas supply piping system during any pressure testing of the gas supply system at test pressures in excess of ½ psig (3.45 kPa).

b.Isolate the fryer from the gas supply piping system during any pressure testing of the gas supply system at test pressures equal to or less than ½ psig (3.45 kPa).

c.Install this fryer on a non-combustible surface with its back and sides at least 6away from any combustible wall, as shown in Figure 2.

d.Install this fryer in a location where adequate combustion and ventilation air is available. Keep the area directly in front of the fryer open for adequate air flow to the burners. DO NOT obstruct the flow of combustion and ventilation air.

h.Keep the fryer area free and clear from combustibles and debris.

!

WARNING

Install this fryer under a ventilation hood that conducts combustion pro- ducts outside the building. Venting must comply with ANSI/NFPA 96

(latest edition).

4

Image 4
Contents Fryer Contents Fryer GAS Supply Specifications Shipping Container InspectionFryer Electrical Specifications Code RequirementsInstallation Requirements LEG Leveling InstructionsGAS Connection Instructions Fryer Operating InstructionsFryer Operating Instructions Fryer Preparation for USELighting Procedure On setting with the valve markShutdown Procedure Daily Cleaning Procedure Fryer Troubleshooting Guide Monthly Maintenance InstructionsFryer Troubleshooting Guide Pilot Recalibrated Brated Limited Warranty