Henny Penny
OFE-321
manual
Heating, Checkout Power Supplied, Contactors, Continued, Replacement
Maintenance
Speaker Assembly
Replacement
2-6.I/O POWER SUPPLY
Filter Switch
Page 9
Page 8
Page 10
Image 9
Page 8
Page 10
Contents
SECTION 2. MAINTENANCE
2-3.COMPLETE CONTROL
2.Remove control panel
2-6.I/O POWER SUPPLY
2-8.FILTER SWITCH
2-7.DRAIN MICROSWITCH Continued
2-9.HEATING ELEMENTS
Replacement
Checkout
Voltage
Temperature Spreader Probe
14. Replace the shortening in the frypot
Checkout Power Removed
2-10.HEATING CONTACTORS 3031 33
Mercury Contactor
2-10.HEATING
Checkout Power Supplied
CONTACTORS
Continued
2-12.HIGH TEMPERATURE
2-11.SPEAKER ASSEMBLY
2-12.HIGH TEMPERATURE
14.Replace front panel 15.Refill with shortening
2-12.HIGH TEMPERATURE LIMIT CONTROL Continued
2-13
2-14
Related pages
How do I operate my Saunatec hot tub?
Click here for the manual
Top
Page
Image
Contents