Emerson Process Management 3500 Transmitter installation instructions Wiring connectors

Page 6

STEP 2. Installing guide rails and wiring connectors

Guide rails

Positions of guide rails and wiring connectors are indicated in Figure 3, page 6. Centers of guide rails should be 27 HP (27 TE) apart, for example, at 1 HP (TE) and 28 HP (TE).

Wiring connectors

The applications platform is shipped with a solder-tail or screw-type connector for input/output wiring, a keyed solder-tail or screw-type connector for sensor wiring (Model 3500 only), and a plug-in connector for power supply wiring.

Working from the front of the rack, use the supplied M2.5x8 screws to install the wiring connectors onto the back of the rack as follows:

1.Use the centers of the guide rails as reference points and refer to Figure 3, page 6.

2.Install the input/output wiring connector at 4 HP (4 TE) from the neighboring unit or from the edge of the rack.

3.(Model 3500 only) Install the keyed sensor wiring connector at 16 HP (16 TE) from the neighboring unit or from the edge of the rack.

4.Install the power supply wiring connector at 25 HP (25 TE) from the neighboring unit or from the edge of the rack.

5

Image 6
Contents Model 3500 Transmitter 9-wire or Model 3300 Peripheral Before YOU Begin Choosing a location European installationsInstallation kit Environmental requirementsDimensions Space requirements for proper ventilationDimensions for mounting in rack Flowmeter cable lengthsInstalling guide rails and wiring connectors Guide rails Wiring connectorsPositions of guide rails and wiring connectors Installing the Model 3300/3500 in the rackConnecting input and output wiring Input/output wiring terminalsIdentify the components shown in Figure Connecting power supply wiring Power supply wiring terminals 3300995