Mounting Accessories
Mounting kit | Part Number |
|
|
|
|
RSF 123 | |
|
|
RSB 123 | |
|
|
RSU 126 | |
|
|
RSB 126 | |
|
|
RSU 129 | |
|
|
RSB 129 | |
|
|
MBU 125 | |
|
|
MBD 129 | |
|
|
PMK 350 low profile projector mount kit, white | |
|
|
Mounting the Transmitter or Receiver
CAUTION: Installation and service must be performed by authorized personnel only.
The
Tabletop Use
Affix the included rubber feet to the bottom of the unit and place it in any convenient location.
Mounting kits
Mount the unit using any of the mounting kits listed above, in accordance with the directions included with the kit.
UL Rack-Mounting Guidelines
The following Underwriters Laboratories (UL) requirements pertain to the installation of the unit into a rack.
1.Elevated operating ambient temperature — If installed in a closed or
2.Reduced air flow — Installation of the equipment in a rack should be such that the amount of air flow required for safe operation of the equipment is not compromised.
3.Mechanical loading — Mounting of the equipment in the rack should be such that a hazardous condition is not achieved due to uneven mechanical loading.
4.Circuit overloading — Consideration should be given to the connection of the equipment to the supply circuit and the effect that overloading of the circuits might have on overcurrent protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
5.Reliable earthing (grounding) — Reliable earthing of
DTP HDMI 301 • Reference Information 16