
CVA615 Coffee System
Technical Information
CVA615 Coffee System – Table of Contents
1.0 | Construction and Design | 9 | ||
| 1.1 | Appliance Overview | 9 | |
|
| 1.1.1 | Front View | 9 |
|
| 1.1.2 | Controls | 10 |
|
| 1.1.3 Interior (Front of Appliance Opened) | 10 | |
| 1.2 | Technical Data | 11 | |
| 1.3 | Layout of Components | 12 | |
2.0 | Installation | 13 | ||
3.0 | Commission and Operation | 14 | ||
| 3.1 | General Operation | 14 | |
|
| 3.1.1 | Preparing Coffee | 14 |
|
| 3.1.2 | Canceling the Preparation | 15 |
|
| 3.1.3 | Steam Control | 15 |
|
| 3.1.4 | Hot Water | 16 |
|
| 3.1.5 Adjusting the Coffee Grinder | 17 | |
|
| 3.1.6 Filling the Coffee Beans Container | 18 | |
|
| 3.1.7 Filling the Water Tank | 19 | |
4.0 | Description of Function | 20 | ||
| 4.1 | Door Switch | 20 | |
| 4.2 | Overflow (Reed) Switch | 20 | |
| 4.3 | Brew Unit – Cleaning and Care | 21 | |
| 4.4 | Brew Unit Removal from the Appliance | 21 | |
| 4.5 | Connection of Brew Unit to Drive Mechanism | 22 | |
| 4.6 | Brewing Procedure | 23 | |
| 4.7 | Grounds Container | 26 | |
| 4.8 | Waste Unit Present Switch | 26 | |
| 4.9 | Water Tank | 28 | |
| 4.10 | Water Level Switch | 29 | |
| 4.11 | Grinder Assembly | 31 | |
| 4.12 | Grinder – Overload Protection | 33 | |
| 4.13 | Ground Coffee Dispensing | 35 | |
| 4.14 | Dispenser Switch | 36 | |
| 4.15 | Brew Unit Drives | 37 | |
| 4.16 | Water Pump | 39 | |
| 4.17 | Flow Meter | 39 | |
| 4.18 | Heaters | 39 | |
| 4.19 | Flow Through Heaters | 40 | |
| 4.20 | Water Path | 42 | |
|
| 4.20.1 | Water Intake | 43 |
|
| 4.20.2 | Water Path - Coffee | 43 |
2