VHX SERIES STEAMER - SERVICE PROCEDURES AND ADJUSTMENTS

1.Access the descalers (cathodic protectors) as outlined in REMOVAL AND REPLACEMENT OF PARTS.

2.Inspect the two descalers hanging in boiler.

NOTE: As descalers erode over time, the diameter decreases while the length increases.

NOTE: A new descaler is approximately 1 3/8" diameter and 3 3/4" long at the core.

A.If either descaler has increased to approximately 6" in length and the core is breaking apart (pieces falling off), both descalers should be replaced; or on an annual basis.

WATER LEVEL PROBE

HOUSING BLOWDOWN

The water level probe housing fills to the same water level in the boiler; and equalizes to the operating pressure in the boiler. When the manual ball valve on the probe housing assembly is opened, water and steam are blown thru this valve and should be visible exiting steamer drain. The probe housing blowdown should be performed in a time frame dependant on the quality of the local water supply and steamer usage. In hard water areas or for steamers heavily used, a more frequent interval should be used. The blowdown procedure is essential to proper operation and component life by removing sediment and scalants that may be lodged in the probe housing.

1.Turn power switch on and allow boiler to completely fill (approximately 1" of water visible in sight glass).

2.Press reset switch to begin heating and allow boiler to reach operating pressure.

3.Remove left side boiler base panel to access the manual ball valve.

WARNING: THE STEAMER AND ITS PARTS ARE HOT. USE CARE WHEN OPERATING, CLEANING OR SERVICING THE STEAMER. THE BOILER CONTAINS LIVE STEAM. STAY CLEAR WHEN OPENING THE VALVE.

4.Open the ball valve for approximately one minute while under pressure to thoroughly flush the probes and housing.

5.Close the ball valve and replace left side panel.

6.Press reset switch to resume heating and allow boiler to reach operating pressure.

7.Steamer is ready for use.

WATER LEVEL CONTROLS

TEST

A build-up of lime scale on or near the water level sensing probes may cause them to retain moisture on the probe surface and can give a false reading. Also, a cracked or damaged insulator may give a false reading.

These conditions may cause one or more of the following to occur:

Boiler no heat

Boiler no fill

Boiler overfill

Boiler no fill and dry fire

NOTE: Dry firing may cause damage to heating elements or boiler. If this condition is suspected, the affected components should be inspected.

Main Water Level Control

NOTE: The main water level control is a dual functioning control that provides low level cut-off protection and differential water level control

1.Turn power switch on and verify:

A.Low water light is lit (front control panel).

B.HL LED is lit on the water level control board.

C.Boiler is filling with water.

D.If boiler isn’t filling with water:

1)Verify 120VAC to boiler fill valve.

2)Verify water supply is on and boiler fill valve isn’t clogged.

2.At the end of the initial fill:

A.Verify approximately 1" of water visible in sight glass.

B.Verify green ready light is lit (front control panel).

C.Verify HL LED is not lit and LLCO LED is lit on the water level control board.

3.Open the ball valve on probe housing assembly (boiler left side) about half way. This will allow boiler water to drain slowly and activate a fill cycle. Do not press the reset switch to start heating. The next step requires a visual sight glass measurement that cannot be obtained if there is boiling action in the vessel.

A.Verify water level in sight glass drops 1/4" to 3/8" before a fill cycle is initiated. Repeat at least twice to verify correct fill.

B.If proper fill wasn’t obtained:

Page 17 of 48

 

F25154 (February 2004)

 

Image 17
Contents VHX24E Shown VHX Boiler Base Series High Efficiency Electric SteamerTable of Contents VHX Series Steamers Model Number of Pans PAN Depth PER Compartment Inches INSTALLATION, Operation Cleaning IntroductionGeneral Water Conditioning SpecificationsBoiler Code Descriptions Boiler PressureElectrical ToolsStandard SpecialPressure Switch Control BOX Components Removal and Replacement of PartsMain Control BOX Components Left Side View Shown Water Level Gauge AssemblyHeating Elements Heating Elements Heating Element Mounting PlateRight Side View Shown Boiler AssemblyDescaler Cathodic Protector Removal Cooking Compartment DoorsGasket HandleLatch Assembly Boiler Service Procedures and AdjustmentsMain Water Level Control Water Level Probe Housing BlowdownWater Level Controls Test Auxiliary Low level Cut-Off Control Cycling Pressure Switch Adjustment Boiler Fill and Cold Water Condenser Solenoid Valves High Limit Pressure Switch AdjustmentCold Water Condenser Thermostat Adjustment Cooking Compartment Intake Shut-Off Valve Adjustment Steam FlowHeating Element Test Door Latch Adjustment Door Sealing AdjustmentElectrical Operation Reset Switch ManualComponent Function Cold Water CondenserSteam Solenoid Valve Compartment Pressure SwitchBlowdown/Drain Boiler Base Controls Component LocationsBoiler Base Controls Cooking Compartment Controls Low Level Cut-Off & Differential Control Water Level ControlsAuxiliary Low Level Cut-Off Relay Board Layout, Legend & Diagnostic Test PointsSchematic Initial Fill and Preheat Sequence of OperationBoiler Blowdown/drain Water Refill After Initial FillVHX Series Steamer Electrical Operation Schematics Cooking Compartment Controls Wiring Diagrams VHX Series Steamer Electrical Operation Heating Element Circuits Cooking Compartment Controls Boiler Base Controls TroubleshootingSymptom Possible Causes Symptom Possible Causes Symptom Possible Causes Cooking Compartment Controls VHX Series Steamer VHX Series Steamer Part Number Description Condensed Spare Parts ListVHX24E, VHX24E5, MHB24E