Vulcan-Hart VHX24E service manual Sequence of Operation, Initial Fill and Preheat

Page 33

VHX SERIES STEAMER - ELECTRICAL OPERATION

SEQUENCE OF OPERATION

Refer to schematic diagram AI1385 for the electrical sequence of operation.

Initial Fill and Preheat

1.Conditions.

A.Boiler connected to correct supply voltage and is properly grounded.

1)Supply voltage transformer energized and 120VAC is output from transformer secondary.

2)120VAC to compartment controls and one side of the power switch.

B.Power switch off.

C.Cycling pressure switch closed.

D.High limit pressure switch closed.

E.Cold water condenser (CWC) thermostat open.

F.Automatic blowdown/drain valve (A.B.D.) open and boiler empty.

G.Water supply valve(s) on.

2.Turn power switch on.

A.Automatic blowdown/drain valve (N.O.) is energized and closes.

B.Water level control (WLC) energized.

1)High level (HL) relay energized, HL-3 N.O. contacts close.

a.Boiler fill solenoid energized, water begins filling the boiler (fill time 4-11 min.).

2)LLCO-1 N.O. contacts remain open.

3)HL LED lit.

C.Auxiliary water level control (AUX WLC) energized.

1)AUX LLCO-1 N.O. contacts remain open.

D.120VAC to common relay terminal on K1(1) N.O., K3(1) N.O., K3(1) N.C., K3(2) N.O. , K4(1) N.O., K4(1) N.C contacts.

E.Low Water light lit thru K3(1) N.C.

F.High Pressure light lit thru K4(1) N.C.

G.K2 energized through the high limit pressure switch (N.C.).

1)K2 contacts K2(1) N.O. & K2(2) N.O. close, no power transferred.

H.120VAC to common terminal on AUX LLCO-1 contacts.

I.120VAC to common terminal on WLC LLCO-1 contacts thru cycling pressure switch (N.C.).

3.Water level reaches LLCO probe for the main water level control and AUX LLCO probe for the auxiliary water level control.

A.LLCO relay on water level control energizes, LLCO-1 contacts (N.O.) close

1)LED on board lights.

2)Cycling contactors B & D energized. Heating elements remain de- energized until manual reset switch pressed.

B.AUX LLCO relay on AUX water level control energizes, AUX LLCO-1 contacts (N.O.) close.

1)LED on board lights.

2)K1 is energized thru AUX LLCO-1 N.O. contacts.

a.K1(1) N.O. and K1(2) N.O. close.

b.Ready light on manual reset switch lit thru K1(1) N.O. contacts.

NOTE: The LLCO and AUX LLCO relays will remain energized and LLCO LED’S will remain lit until the water level drops below the LLCO probes or the power switch is turned off.

NOTE: The manual reset switch could be pressed to energize the heating elements but it’s preferred to let the boiler fill the to the high level before continuing.

4.Water reaches LL (low level) probe.

5.Water reaches HL (high level) probe.

A.Boiler fill solenoid is de-energized.

B.HL LED goes out.

6.Manual reset switch pressed.

A.K3 is energized.

NOTE: Relay K3 remains energized through K3(1) N.O. latching circuit.

1)K3(1) N.O. contacts close and K3(1) N.C. contacts open.

2)Low water light goes out.

3)K3(2) N.O. contacts close.

a.120VAC to common side of K4(2) N.O. contacts.

B.K4 is energized.

NOTE: Relay K4 remains energized through K4(1) N.O. latching circuit.

Page 33 of 48

 

F25154 (February 2004)

 

Image 33
Contents VHX24E Shown VHX Boiler Base Series High Efficiency Electric SteamerTable of Contents VHX Series Steamers INSTALLATION, Operation Cleaning Introduction GeneralModel Number of Pans PAN Depth PER Compartment Inches Water Conditioning SpecificationsBoiler Code Descriptions Boiler PressureElectrical ToolsStandard SpecialPressure Switch Control BOX Components Removal and Replacement of PartsMain Control BOX Components Left Side View Shown Water Level Gauge AssemblyHeating Elements Heating Elements Heating Element Mounting PlateRight Side View Shown Boiler AssemblyDescaler Cathodic Protector Removal Cooking Compartment DoorsGasket HandleLatch Assembly Boiler Service Procedures and AdjustmentsWater Level Probe Housing Blowdown Water Level Controls TestMain Water Level Control Auxiliary Low level Cut-Off Control Cycling Pressure Switch Adjustment Boiler Fill and Cold Water Condenser Solenoid Valves High Limit Pressure Switch AdjustmentCold Water Condenser Thermostat Adjustment Intake Shut-Off Valve Adjustment Steam Flow Heating Element TestCooking Compartment Door Latch Adjustment Door Sealing AdjustmentElectrical Operation Reset Switch ManualComponent Function Cold Water CondenserCompartment Pressure Switch Blowdown/DrainSteam Solenoid Valve Boiler Base Controls Component LocationsBoiler Base Controls Cooking Compartment Controls Low Level Cut-Off & Differential Control Water Level ControlsAuxiliary Low Level Cut-Off Relay Board Layout, Legend & Diagnostic Test PointsSchematic Initial Fill and Preheat Sequence of OperationBoiler Blowdown/drain Water Refill After Initial FillVHX Series Steamer Electrical Operation Schematics Cooking Compartment Controls Wiring Diagrams VHX Series Steamer Electrical Operation Heating Element Circuits Cooking Compartment Controls Troubleshooting Symptom Possible CausesBoiler Base Controls Symptom Possible Causes Symptom Possible Causes Cooking Compartment Controls VHX Series Steamer VHX Series Steamer Condensed Spare Parts List VHX24E, VHX24E5, MHB24EPart Number Description