GE ZV30R, ZV36R, ZV48R installation instructions Duct Fittings, Flexible ducting

Page 7

Advance Planning

DUCT FITTINGS

Use this chart to compute maximum permissable lengths for duct runs to outdoors.

For best results, use 10" diameter duct.

Note: Do not exceed maximum permissable equivalent lengths!

Maximum recommended duct length for these hoods: 150 feet

Flexible ducting:

If flexible metal ducting is used, all the equivalent feet values in the table should be doubled. The flexible metal duct should be straight and smooth and extended as much as possible.

Do NOT use flexible plastic ducting.

Note: Any home ventilation system, such as a ventilation hood, may interrupt the proper flow of combustion air and exhaust required by fireplaces, gas furnaces, gas water heaters and other naturally vented systems. To minimize the chance of interruption of such naturally vented systems, follow the heating equipment manufacturer’s guidelines and safety standards such as those published by NFPA and ASHRAE.

Hoods Are Equipped

For 10" Round Duct

*Hoods are supplied with a 10" round transition. A locally supplied transition is required for other sizes.

Note: Outlet on top of hood is 8-1/8" x 8".

*Actual length of straight duct plus duct fitting equivalent. Equivalent length of duct pieces are based on actual tests conducted by GE Evaluation Engineering and reflect requirements for good venting performance with any ventilation hood.

 

Equivalent

Quantity

Total

Duct Piece

Length*

Used

Length

10" round

 

 

 

to 8" round

5 ft.

 

 

Round,

1 ft.

 

 

straight

(per foot length)

 

90° elbow

8" Dia. 52 ft.

 

 

 

10" Dia. 24 ft.

 

 

45° elbow

8" Dia. 31 ft.

 

 

 

10" Dia. 14 ft.

 

 

Round

8" Dia. 99 ft.

 

 

wall cap

10" Dia. 41 ft.

 

 

with damper

 

 

 

Round

8" Dia. 136 ft.

 

 

roof cap

10" Dia. 56 ft.

 

 

Total Duct Run

7

Image 7
Contents Installation Instructions Completion time 1 to 3 hours Read these instructions completely and carefullyProduct Dimensions ContentsInstallation without Warming Shelf Installation ClearancesOptional Duct Cover Accessories Installation with Warming ShelfRestaurant-Style Hoods Determine Installation HEIGHT, Duct Cover AccessoriesWall Framing for Adequate Support Power SupplyAdvance Planning Ductwork PlanningFlexible ducting Duct FittingsRemove the Packaging Tools and Materials RequiredHardware Package Parts ProvidedAlternate Knockout Locations for soffit installation Determine HOOD, Ductwork and Wiring LocationsFor Vertical Straight Up Ducting Test Duct Cover Fit Install Hood Onto WallInstall Bottom Mounting Screws Hang Hood On Wood SupportMount Hood onto Soffit or Cabinet Install Hood to Soffit or Beneath CabinetsInstall Motor Install Duct CoversConnect Ductwork Install Backguard and Shelf This hood can be installed with Install FiltersInstall Implement Rods Install Shelf onlyFinalize Installation Pub. No