GE ZV30R, ZV36R Determine HOOD, Ductwork and Wiring Locations, For Vertical Straight Up Ducting

Page 10

Installation Instructions

STEP 1 DETERMINE HOOD, DUCTWORK AND WIRING LOCATIONS

Use a level to draw the cooktop centerline location. Draw the line to ceiling height.

Measure desired distance from the bottom of the hood to the cooking surface.

Note: If you are installing the hood with duct covers, be sure to read “Using Duct Cover Accessories” page 7. Exact installation height may be determined by use of one or more duct covers.

9-7/8"

Top of Hood

Wood

22-1/2"

Support

Determine bottom of hood location (Dimension A) by subtracting 12-1/2" from the desired installation height.

Installation

Height

Dim. A

20"

 

 

*House Wiring

 

 

 

 

 

 

 

 

 

 

Bottom of Hood

 

Location

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Dimension A

 

 

Cooking Surface

*See recessed

 

location below.

Use a level to draw a straight horizontal pencil line indicating the bottom of the hood.

From the line indicating the bottom of the hood, measure 20" up and draw another line for the location of the wood support. See illustration.

FOR VERTICAL (Straight Up) DUCTING:

Use a level to draw a centerline from the bottom of the hood to ceiling or soffit.

If venting out the ceiling, extend the centerline forward on the ceiling or soffit.

Locate the centerline of a 10-1/2" hole on the ceiling or soffit by measuring 6" from the wall.

FOR DUCTING THROUGH REAR WALL:

Measure 9-7/8" above the marked line for the top of the hood. At the centerline, draw a horizontal line to mark the location for a 10-1/2" diameter hole.

House Wiring Location:

The junction box is fastened to the back of the hood on the right side.

14-1/4"

Electrical

Area

18-1/16" for 48" Models 12-1/16" for 36" Models

9-1/16" for 30" Models

6-1/2"

14" for 48" Models 8" for 36" Models 5" for 30" Models

The recessed back side of the hood provides a large area for the house wiring to exit the wall and be routed to the rear knockout and junction box.

The location for the house wiring depends on the installation height of the hood and the width of the hood. See shaded “Electrical Area” for locations.

Remove junction box cover and knockout. Install strain relief.

Alternate Knockout Locations (for soffit installation)

If the installation requires, the junction box can be relocated from the back to the top of the hood. Remove 3 screws, align box to top knockout and secure with original screws.

Remove junction box cover and knockout. Install strain relief.

10

Image 10
Contents Installation Instructions Read these instructions completely and carefully Completion time 1 to 3 hoursContents Product DimensionsInstallation with Warming Shelf Installation ClearancesOptional Duct Cover Accessories Installation without Warming ShelfDetermine Installation HEIGHT, Duct Cover Accessories Restaurant-Style HoodsDuctwork Planning Power SupplyAdvance Planning Wall Framing for Adequate SupportDuct Fittings Flexible ductingTools and Materials Required Remove the PackagingParts Provided Hardware PackageAlternate Knockout Locations for soffit installation Determine HOOD, Ductwork and Wiring LocationsFor Vertical Straight Up Ducting Hang Hood On Wood Support Install Hood Onto WallInstall Bottom Mounting Screws Test Duct Cover FitInstall Hood to Soffit or Beneath Cabinets Mount Hood onto Soffit or CabinetInstall Motor Install Duct CoversConnect Ductwork Install Filters Install Backguard and Shelf This hood can be installed withInstall Implement Rods Install Shelf onlyFinalize Installation Pub. No