GE ZV48R, ZV36R, ZV30R installation instructions Tools and Materials Required, Remove the Packaging

Page 8

Installation Preparation

TOOLS AND MATERIALS REQUIRED

(NOT SUPPLIED)

 

1/4" pivoting

Hammer

 

 

 

 

hex socket

 

Duct tape

Wire cutter/stripper

 

Key Hole Saw

Electric or battery operated drill

 

 

 

 

 

and 1/8", 3/8" bits

 

 

 

 

 

 

Pencil and tape measure

 

 

 

 

10" round metal

 

 

 

 

 

 

duct, length to

 

 

Safety glasses

Wire nuts

 

suit installation.

 

 

 

 

 

 

Spirit level

 

 

 

 

 

Phillips and flat

 

 

 

 

 

 

blade

 

 

 

 

Flashlight

 

screwdrdivers

 

 

 

 

 

 

 

 

 

 

 

 

Strain relief for

 

Step ladder

 

 

 

junction cover.

Pliers

 

 

 

120V 60Hz. 15 or 20 Amp,

Metal Snips

Saber saw

 

 

 

2-wire with ground. Properly

or Sawsall

grounded branch circuit.

 

REMOVE THE PACKAGING

Remove packages from the “V” shaped cardboard section. Remove shipping pads.

Lift the hood out of the box.

IMPORTANT: Lift the hood by grasping the outside edges of the exhaust opening on the top.

 

 

Duct

 

 

Transition

Wood

 

 

Mounting

Hood

Parts

Support

 

 

 

 

Motor

 

 

Mounted

 

 

on Skid

 

Shipping Carton

The vent hood motor is shipped secured to the skid with 4 screws. Locate and remove 2 screws on each side of the motor. Discard the shipping skid and screws.

Grease filters must be removed. Grasp the latch, pull the filter up and lift out.

Lift to remove the grease trays. Set grease filters and trays aside for later installation. DO NOT DISCARD.

From the inside of the hood, loosen (do not remove) the 2 screws holding the wood mounting support to the back of the hood. The screws should be backed out of the wood to 1/4". Remove and set aside the mounting support with screws for later installation.

DO NOT DISCARD.

Remove tape and packing material from the hood and all supplied parts.

8

Image 8
Contents Installation Instructions Read these instructions completely and carefully Completion time 1 to 3 hoursContents Product DimensionsInstallation Clearances Optional Duct Cover AccessoriesInstallation with Warming Shelf Installation without Warming ShelfDetermine Installation HEIGHT, Duct Cover Accessories Restaurant-Style HoodsPower Supply Advance PlanningDuctwork Planning Wall Framing for Adequate SupportDuct Fittings Flexible ductingTools and Materials Required Remove the PackagingParts Provided Hardware PackageFor Vertical Straight Up Ducting Determine HOOD, Ductwork and Wiring LocationsAlternate Knockout Locations for soffit installation Install Hood Onto Wall Install Bottom Mounting ScrewsHang Hood On Wood Support Test Duct Cover FitInstall Hood to Soffit or Beneath Cabinets Mount Hood onto Soffit or CabinetConnect Ductwork Install Duct CoversInstall Motor Install Filters Install Backguard and Shelf This hood can be installed withFinalize Installation Install Shelf onlyInstall Implement Rods Pub. No