If a High/Low voltage condition exists for longer than 5 seconds, the compressor will be de-energized. The controller display will flash “Lo LinE“ o and off while the condition exists.

Re-energization is automatic upon correction of the fault condition and af- ter a delay cycle of about 2 minutes.

High and Low Voltage Protection at 115 VAC Voltage Cutout: +/- 12.5 % (101 - 129 VAC) Voltage Cut-In: +/- 7.5 % (106 - 124 VAC)

High and Low Voltage Protection at 230 VAC Voltage Cutout: +/- 12.5 % (203 - 257 VAC)

Voltage Cut-In: +/- 7.5 % (213 - 247 VAC)

See the Caution in the front of this manual for additional information.

13.2CE Comments

13.2.1EMC Directive

This instrument has been tested to meet the European Electromagnetic Compat- ibility Directive ( EMC Directive, 89/336/EEC). The Declaration of Confor- mity for your instrument lists the specific standards to which the unit was tested.

13.2.2Low Voltage Directive (Safety)

In order to comply with the European Low Voltage Directive (73/23/EEC), this instrument has been designed to meet the IEC 1010-1 (EN 61010-1) and IEC 1010-2-010 (EN 61010-2-010) standards.

58

Image 60 Contents
GE Kaye World Headquarters Table of Contents Parts and Controls General OperationController Operation Maintenance Trouble Shooting Digital Communication InterfaceWiring Diagram Figures Tables Symbols Used Before You StartSafety Information Canadian Standards AssociationBurn Hazard Bath Fluids Cold Baths Customer Service Information World HeadquartersIntroduction Specifications Environmental ConditionsHardware Warranty and Assistance Instrument WarrantyIn-Warranty Repairs After-Warranty RepairsEquipment Maintenance Agreements Customer SupportCustomer Support Agreement Customer Site AssistanceQuick Start UnpackingSet-up Power Setting the TemperatureAccess set-point selection Set-point 1, 25.0C currently used Installation Drain Valve Installation InstructionsBath Environment Dry-out PeriodFilling With Fluid Necessary General Comparison CalibrationBath Use Calibration of Multiple Probes Parts and Controls Control PanelBath Tank and Lid Back PanelBack Panel Temperature Range General OperationBath Fluid ViscositySafety Thermal ConductivityThermal Expansion Electrical ResistivityCost Commonly Used FluidsWater Distilled EthanolFluid Characteristics Table Mineral OilSilicone Oil Dow Corning 200.05, 200.10 Limitations and Disclaimer Table of Various Bath FluidsStirring HeaterRefrigeration Temperature Controller OperationImportant Refrigerant Information General Operation Bath Temperature Temperature Set-pointController Operation Programmable Set-pointsDisplay Temperature Temperature Scale Units Set-point ValueScan Scan ControlScan Rate Heater Power Secondary MenuProportional Band New proportional band setting Cutout CO= 80CController Configuration Operating ParametersHigh Limit Low LimitSerial Interface Parameters CoolingDuplex Mode Baud RateSample Period Calibration Parameters LinefeedHard Cutout 11.2 R0Alpha DeltaDigital Communication Interface Serial CommunicationsWiring SetupRS-232 Cable Wiring for IBM PC and CompatiblesInterface Commands Duplex ModeSerial Operation Sample PeriodSecondary Menu Lfeed=on Lf=on Calibration Procedure Calibration ProcedureCalibration Equipment Calibration Calibration Procedure Maintenance Maintenance Trouble Shooting TroubleshootingLow Voltage Directive Safety CE CommentsEMC Directive Wiring Diagram Revisions