4. Optional Up-stream Heating Coil

If an optional up-stream heating coil is provided with the unit an additional equipment support may be required. If filters only are provided in this section, additional support is not needed. Follow the guidelines below for determining the coil section support required. Page 18 lists unit weights for equipment support load requirements.

Equipment Support Requirements:

 

Slab/Rail Mount

Curb Mount

 

 

 

NV-90

None

Curb Height

 

 

 

NV-120

12”

Curb Height + 12”

 

 

 

Coil Section

Typical NV-120 installation on cement slab with optional up-stream heating coil section .

See page 10 for attachment instructions.

Equipment Support

Cement Slab

5. Attach Ductwork to Unit Discharge

Chart and drawing below show opening size (ID) and location for discharge collar. Also included is the recommended straight duct lengths for optimal performance. Greenheck recommends attaching ductwork using a rubber duct section at the unit to eliminate vibration.

Discharge Opening Sizes

 

A

B

C

D

Straight

 

Duct Length

 

 

 

 

 

 

 

 

 

 

 

NV-90

161/4

24

34 1/2

223/8

81

NV-120

161/4

251/2

34

231/4

96

D C

B

A

Back View

NV-90 and NV-120

8

Image 8
Contents Greenheck Table of Contents Installation Instructions for Typical InstallationsMounting the Unit Attach Ductwork to Unit DischargeInstall Roof Curb Equipment Support Install DuctworkNV-45 w/Downblast Discharge Roof OpeningInstall Supply Unit Complete Installation1b. Install Unit 1a. Slab ConstructionRail Mounting Curb MountingOptional Up-stream Heating Coil Discharge Opening SizesLocate and Cut Roof Opening Install CurbAssemble Roof Curb Install Unit Detail aAttach Weatherhood Install Birdscreen or Optional Weatherhood FiltersAttach Support Legs Sequence for wiring NV unit Electrical InstructionsFor units without control centers For units with control centersAir Volume Check and Measurement Settings for Optional ComponentsSpecial Tools Required Check Voltage Check Blower RotationInstructions for Coils Steam CoilsDirect Expansion Coils Main SteamCoil Maintenance CleaningWater Coils FiltersBlower Unit General Dimensions and Weights Elevation ViewMaintenance Weeks after startupEvery 3 Months YearlyMaintenance Documentation Field Start-Up Documentation