Cleveland Range 24/36CGM manual Dissolve Order Quantities, Overview Pump Descaling Procedures

Page 14

Operator’s Manual

P/N-260AOZ-A

NOTE:

Only service technicians authorized by Cleveland Range should perform the descaling procedure. Read and

be familiar with the procedure before starting. Follow the procedure exactly as given.

DISSOLVE Descaling Liquid

Use only Cleveland Range DISSOLVE descaling product. Five gallons of descaling liquid will be needed during this procedure. Avoid unnecessary contact with the descaling product; read and follow safety precautions on the container label.

DISSOLVE Order Quantities

Container Size

Qty

Part No.

 

 

 

1-gallon bottles

6

106174

 

 

 

5-gallon pail

1

1061741

 

 

 

5-gallon pails

12

10617411

 

 

 

5-gallon pails

24

10617412

Overview of

Pump Descaling Procedures

Below is a summary of the descaling procedure using the Pump System. The detailed procedure is given on page 3 and 4.

Descaling should be done as required by your maintenance schedule. The process takes about an hour and a half to complete.

Part A – Equipment Setup

Turn off the steamer to drain the boiler

Remove the handhold plate of the boiler and attach the hand-hole plate with the descaling ports

Connect feed and drain hoses

Fill reservoir pail with DISSOLVE descaling liquid and insert pump.

Part B – Descaling

Turn on power to steamer; boiler will begin to fill

Turn on pump

Monitor liquid levels in boiler and pail- regulate level using hand valves

Let liquid circulate for one hour

Turn OFF steamer, pump; boiler will drain

Part C – Clean Water Flush

Turn On steamer; boiler will fill

Empty the pail of spent solution, refill with fresh water

Route Drain hose to floor drain

Turn pump ON and circulate for 5 minutes, monitoring water levels

Turn OFF pump; close all valves; turn OFF steamer; boiler will drain

Replace hand-hole plate, check gasket

Part D –Take Down and Return to Service

Turn ON Steamer; boiler will fill

Remove hoses and couplings;

Activate steam switch; unit ready to operate

14

______________________________________________________________________________

Image 14
Contents Installation, Operation & Maintenance Manual Table of Contents Operator’s Manual WaterDrain Line Connection Installation Safety Installation InstructionsInstallation Checks For Electric-Powered Steam Generators ConnectSelf-Contained Steam Coil Generator Steam Generator Controls OperationControls and Control Panels Steamer Compartment Control PanelsManual Cooking Operation Key Pad Controls Cooking OperationsCooking Operations for Key Pad Control Panel Cooking Operations for Dial Timer Control Panel Automatic Cooking Operation Key Pad ControlsBoiler Shutdown Manual Cooking Operations Dial Timer ControlsCare and Cleaning Maintenance Preventive Maintenance and Record KeepingAgency Descaling Procedure Overview Pump Descaling Procedures Dissolve Order QuantitiesDescaling Detail Procedure- Using the Descaling Pump SystemEquipment Setup Flushing Troubleshooting Troubleshooting Notes Convection Steamer Cooking Guidelines Sizing Up Pan Capacity How Much? How Many? Convection Steamer Suggested Timer Setting Guidelines Dehydrated Foods Operator’s Manual