Cleveland Range SD-1200 manual Maintenance, Pressure Relief Valve Testing Procedure, Marine Lock

Page 13

MAINTENANCE

ALL SERVICE MUST BE PERFORMED BY A

QUALIFIED SERVICE TECHNICIAN.

This kettle requires very little preventative maintenance other than daily cleaning.

The pressure relief valve must be tested twice a year.

PRESSURE RELIEF VALVE TESTING PROCEDURE

WARNING

Kettle will be hot. Use gloves for protection.

The pressure relief valve (optional on kettles) must be checked at least twice a year as part of the normal maintenance performed.

MARINE LOCK

Inspect lock at least twice yearly.

1.Check for excessive play or wear on pivot. Adjust or replace as required.

2. Insure lock is catching over the centre of the stop pin and not bent to one side or the other. Adjust or replace as required.

1.Open steam valve and preheat kettle.

2.Stand to the side of the pressure relief valve discharge tube and pull ring three or four times to insure free movement. Hold valve open for two seconds each time, insuring there is rapid steam escape each time.

3.If valve appears to be sticking replace pressure relief valve. If foreign material is discharged, replace pressure relief valve and eliminate the source of contamination.

WARRANTY

Our Company supports a worldwide network of Maintenance and Repair Centers. Contact your nearest Maintenance and Repair Centre for replacement parts, service, or information regarding the proper maintenance and repair of your cooking equipment

In order to preserve the various agency safety certification (UL, NSF, ASME/Ntl. Bd., etc.), only factory-supplied replacement parts should be used. The use of other than factory supplied replacement parts will void warranty.

STEAM TRAP

To remove line condensate that forms inside the steam jacket, each kettle should be equipped with a steam trap in the line of the kettle outlet to the drain. A good steam trap at startup releases air and wet steam into the drain line for a few minutes, then holds the steam jacket. During cooking, the trap periodically releases accumulated condensate. If the kettle's cooking performance becomes inadequate after long use, replacement of the steam trap with a new one may restore kettle operation to peak efficiency.

11

Image 13
Contents Operators Manual Table of Contents Installation Schematics Final Installation CheckSteam Potable WaterOperation Operating InstructionsCare and Cleaning Cleaning InstructionsService Parts Item no Description QTY For SD Stands Plumbing AssemblyFront Access Panels Plumbing Assembly for SD StandsFaucet Assemblies Item no Pressure Relief Valve Testing Procedure MaintenanceWarranty Marine LockProblem Troubleshooting GuideKDT-1-T Specification DrawingsRight 4 Left 4 Back KDT-3-T & KDT-6-TKDT-12-T & KDT-20-T SD Stands with