Carrier Miracool owner manual Contents, General, Unit Inspection, Installation

Page 2

CONTENTS

 

 

Page

GENERAL

2

UNIT INSPECTION

2

INSTALLATION

2-5

LOCATE UNIT

2

LEVEL

4

INSTALL SHELVES

5

CONDENSATE DISPOSAL

5

START-UP

6-7

PRELIMINARY CHECKS

6

INITIAL START-UP

7

REFRIGERATION SYSTEM SERVICE

8-11

COMPONENTS

8

SERVICE AND TROUBLESHOOTING ....

8-11

MAINTENANCE

12-13

LAMP REPLACEMENT

12

CONDENSATE REMOVAL

12

CONDENSER/EVAPORATOR

12

CABINET EXTERIOR

12

INTERIOR SURFACE

12

GENERAL

These instructions cover the installation, operation, and maintenance of Carrier Miracool™ series glass door merchandiser units, size 2000L.

UNIT INSPECTION

Examine all packages for damage to packaging material. Damage to external packaging may have resulted in unit damage. Check packages for all accessories and components, including legs, casters, and shelves. File a claim immediately with the shipping company if shipment is damaged or incomplete.

INSTALLATION

LOCATE UNIT

Refer to Figure 1 for unit components. Units are designed for indoor placement only. Provide at least 3 inches of space between unit cabinet and any adjacent wall or fixture.

Remove skid base by removing the retaining screws (8 hex head bolt screws). Refer to Figure 2 to remove the front grille and gain access to skid retaining screws. If optional casters will be used, unit must be located on flat, level surface. Refer to Table 1 for a list of standard parts.

TABLE 1 – STANDARD PARTS

PART

FACTORY

FIELD INSTALLED

QUANTITY

 

INSTALLED

 

 

 

 

 

 

Shelves

 

X

15

 

 

 

 

Shelf Clips

 

X

60

 

 

 

 

Instruction Manual

-

-

1

 

 

 

 

Leveling Feet

X

 

4

 

 

 

 

Lamps

X

 

4

 

 

 

 

Note: Parts shown are for standard units. Quantity of shelves and clips may vary based on factory-supplied options.

2

Image 2
Contents Miracool Glass Door Merchandiser 2000L General ContentsInstallation Unit InspectionMiracool Bottle Cooler Unit Components MC2000H Shown To Level Unit To Gain Access to Leveling FeetLevel Unit Condensate Disposal Install ShelvesTo Install Shelves Preliminary Checks BI-PIN Fluorescent Lamp Installation / VerificationSTART-UP Electrical Supply and ConnectionsInitial START-UP Power SupplyTemperature Control Unit DataComponents Refrigeration System ServiceService Troubleshooting Evacuation Charging Refrigeration SystemRefrigeration System Refrigeration System Service and Analysis ChartMalfunction Possible Cause Solution Wiring Diagram Maintenance Methods for Cleaning Stainless Steel Task Cleaning Agent Method of Application Effect on FinishCopyright 2006 Carrier Corporation