Carrier Miracool owner manual To Gain Access to Leveling Feet, To Level Unit

Page 4

LEVEL UNIT

To provide adequate condensate drainage and proper door alignment and operation of unit, the unit cabinet must be level. Leveling feet are factory installed. Remove the front grille to gain access to front and back feet.

TO GAIN ACCESS TO LEVELING ￿FEET

DANGER

Before servicing unit, disconnect electrical service. Failure to disconnect electrical service could result in electrical shock and cause personal injury or death.

1. After disconnecting the unit from the power supply, remove the grille retaining screw located in the upper-most part of the grille. (See Figure 2)

2. Lift the grille up and away from the unit.

3. Unplug the power supply cord located at the bottom of the cabinet. (See Figure 3)

FIGURE 2 – REMOVE FRONT GRILLE

FIGURE 3 – DISCONNECT SERVICE CORD

TO LEVEL UNIT

￿ DANGER

Before servicing unit, disconnect electrical service. Failure to disconnect electrical service could result in electrical shock and cause personal injury or death.

Swing Doors- The door is equipped with gravity assisted cams and will not function properly without proper leveling of cabinet. Adjust feet using adjustable wrench so that unit sits approximately level to floor and doors close properly. For best door operation, adjust leveling feet so that cabinet has a 1/16-in. rake or slant from front to back. Optional casters are available to replace leveling feet.

Sliding Doors- The door will not function properly without proper leveling of cabinet. Adjust feet using adjustable wrench so that unit sits approximately level to floor and doors close properly.

NOTE: If casters are not used, local codes may require cabinet to be sealed around the perimeter of the cabinet base. Consult local sanitation codes. Use only sealant material approved for this use, such as Dow Corning #732.

4

Image 4
Contents Miracool Glass Door Merchandiser 2000L Contents InstallationGeneral Unit InspectionMiracool Bottle Cooler Unit Components MC2000H Shown Level Unit To Gain Access to Leveling FeetTo Level Unit To Install Shelves Install ShelvesCondensate Disposal BI-PIN Fluorescent Lamp Installation / Verification START-UPPreliminary Checks Electrical Supply and ConnectionsPower Supply Temperature ControlInitial START-UP Unit DataService Troubleshooting Refrigeration System ServiceComponents Evacuation Charging Refrigeration SystemMalfunction Possible Cause Solution Refrigeration System Service and Analysis ChartRefrigeration System Wiring Diagram Maintenance Methods for Cleaning Stainless Steel Task Cleaning Agent Method of Application Effect on FinishCopyright 2006 Carrier Corporation