Liebherr HCB 2062, HC 2062 Planning Information, Door swing clearence Figure

Page 4

Planning Information

Unit Dimensions - Figure 1

Unit Venting - Figure 3

 

HC/HCB 20 appliances do not require any

 

ventilation openings in the cabinet. The required

 

airflow is directed through the toe kick area.

 

A = 3" (76 mm)

 

B = 79-13/16" (2027 mm)

Figure 1

C = 35-13/16" (910 mm)

D = 3" (76 mm)

 

E = 24" (610 mm)

 

G = 42-7/16" (1078 mm)

 

H = 37-1/8" (943 mm)

Door swing clearence - Figure 2

Please allow for door swing clearance at locations next to a wall.

The illustrated measurement is without mounted front panels. Be sure to add your panel thickness and handle depth to this measurement in order to avoid interferences.

Figure 2

Figure 3

It is important to use the provided cover grille for the ventilation opening. This opening must not be covered with a cabinet base.

4

Image 4
Contents Installation Instructions HCBPlease Read and Follow These Instructions Installation Guidelines Planning Information Door swing clearence FigureCabinet Opening Dimensions Figure Panel Dimensions Inset Installation Style Figure Panel Dimensions Frameless Installation Style Figure Mounting the anti tipping device on concrete floors Blocking for SafetyMounting the anti tipping device on wooden floors Mounting the anti tipping device in cabinets deeper than Cover strips FigureSafety Instructions and Warnings IceMakerIceMaker Connection to the Water SupplyIceMaker Installation Adjusting the front of the drawerLeveling the Appliance Figure Fasten the appliance in the recessMounting the attachment brackets onto the door panels Figure Mounting the freezer drawer Mounting the refrigerator doorSoft-stop cylinder retracts in the detached state Installation Mounting the ventilation grille