hussman RHR 1/2 HEX, rhr-hex, RHR-SQ Cut and Plan Views, Installation, RHR-HEX 6, Leveling, Rev

Page 3

Rev. 0608

Cut and Plan Views

501/4"

Food

Light

Light

Food

Warmer

Warmer

 

 

Warming

18"

Griddle

 

 

 

 

281/2" (19 1/2")

 

 

 

 

 

Food

 

 

12"

Warmer

 

 

 

 

 

 

183/4"

58"

Warming

13"

281/2" (191/2")

Griddle

 

 

 

329/16"

16"

 

 

 

Control Panel

 

 

 

 

 

 

 

 

 

 

211/

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

101/2"431/4" (251/8") 101/2"

641/4" (471/8")

RHR-HEX 6' & (4')

Self-Service Hot

653/8" (47 3/8")

/8")

473/8"

27"

483/4" (275

371/2" (261/2")

773/8" (547/16")

RHR-HEX 6' & (4')

PLAN VIEW

9/16"

 

32

/16"

 

211

101/2"

121/4"

ELEC.

MECHANICAL STUB UP AREA 4" X 6"

2011/16"

RHR SQUARE

Self Service Hot Food

Control

Panel

431/4" (251/8")

101/2"

541/4" (473/8")

 

RHR2-HEX 6' & (4')

Self-Service Hot

Scale = 1/2"

/8")

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2311/16" (333

 

 

 

141/8" (245/8")

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2'-21/2"(3'-11/2")

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4'-67/16"(6'-53/8")

 

 

 

 

 

 

 

 

 

 

 

RHR-HALF-HEX-4' (6')

 

 

 

 

 

 

 

 

 

 

 

 

Self-Service Hot

IMPORTANT: It is imperative that cases

be leveled front to back and side to side prior to joining.A level case is necessary to ensure proper operation.

Installation

Leveling

1.Check floor where cases are to be set to see if it’s level. Determine where the highest part of the floor

Cases will be shimmed off this point Using case blueprints, measure off and mark on floor the exact dimensions of the case footprint Snap chalk line for front and back position of base rail. Mark location of each joint front and back. Use a transit to find the highest point along both lines. Mark the difference, and place the appropriate number of shims required to maintain high-point level.

Image 3
Contents Island hot food case RevGeneral Instructions Table of ContentsLeveling InstallationCut and Plan Views RHR-HEX 6Bumper Installation Instructions Installation ContdHelpful Hints Boston SeriesBoston 2000 Eco Series Boston 1000 Series Installation Ballast Location Wiring Color Code Electrical Circuit IdentificationField Wiring and Serial Plate Amperage ElectricalUser Information User Information Contd Replacing Overhead Heat Lamps MaintenanceRHR-HEX Electrical Wiring DiagramsW6100012 Wiring DiagramsLoads, amp 208 240 19.7 22.8 14.2 16.40608 WiringDiagramsContd 208 V 240 21.1 23.9 11.3Contd DiagramsHEX-0608 Wiring Diagrams Contd19.8 22.2 15.3 17.7 W6100020208 V 240 L1 24.5 L2 18.6 L3 16.1 W6100015RHR HEX 5-6 1 Shelf Unit 26.5 W61000054 Square Case Model W6100007 Wiring Diagrams10.2 Flr Lamps, ContactorW6100008 10/22/99 Drawing Title RHR Hex 56 1/2 Case Wiring14.8 17.1 16.5 18.8 208 / 240 VAC 1Ø 50 / 60zAppendix D. Recommendations to User Appendix A. Temperature GuidelinesAppendices Appendix C. Field RecommendationsAppendices Contd Service Record
Related manuals
Manual 20 pages 54.64 Kb