SECTION 2-INSTALLATION

SECTION 2-INSTALLATION

J. Electric Supply (continued)

freezer. It is most important that a voltage reading be made at the compressor-motor electrical connections, or as close to the compressor- motor as possible, while the refrigerator or freezer is in operation, to assure that the correct voltage required by the compressor is being supplied.

All refrigerator or freezer electrical systems are internally grounded.

K. Installation Checklist

After the cabinet has been installed, leveled and cleaned as described in the preceding paragraphs, refer to the following checklist prior to start-up.

Full voltage of the correct type, on a line not affected by the operation of other electrical appliances, must be available for proper operation. Condensing units are designed to operate with a voltage fluctuation of plus or minus 10% of the voltage indicated on the cabinet electrical data plate. Burn-out of a condensing unit due to exceeding the high or low voltage limits will void the factory warranty.

Leak check all exposed refrigeration line connections. Make sure refrigeration lines are not dented, kinked or rubbing.

Check condenser fan for freedom to rotate without striking any stationary members.

Cabinet must be properly leveled.

Do Not become alarmed if a trace of freon gas is detected in the internal cabinet air. This may be due to refrigerant used in expanding the foam insulation used in this cabinet.

NOTE: All motors are lifetime oiled and sealed. All self- contained models are shipped from the factory with the service valves opened ready for operation.

When ordering replacement parts, you must include the complete cabinet model and serial numbers.

“End Of Section, Click Here For Table Of Contents”

Image 17
Contents Series Reach-In Refrigerators and Freezers Limited Warranty General Conditions Procedure for Obtaining Replacement Compressors in Warranty Retain this Manual for Future Reference Table of Contents Section Description Control and Component Location Component Function Description Dimensions End Of Section, Click Here For Table Of Contents Unpackaging Procedure Section InstallationReceiving Shipment Removing DoorsLock Keeper Hinges and Lock KeeperRehingeability One & Two Section Long Door Cabinet Locating Your New Storage Refrigerator or Freezer Installing Legs or CastersInstalling Shelves Cleaning CabinetLeveling Initial Cabinet Set-UpElectric Supply Steel Rod Type Pan Slide Racks Refer to FigureAngle Type Pan Slides Installation Checklist Section Operation Temperature ControlThermometer Operation Loading ProductInitial Cleaning of Cabinet Section MaintenancePeriodic Cleaning Daily Exterior Surface Cleaning Cleaning and sanitizingOnce Every Three Months, Condenser Maintenance Weekly Interior Accessory CleaningLubrication Treat Hard Water Use of Proper Tools and Cleaning MethodsSection Troubleshooting Troubleshooting & Servicing Refrigeration System End Of Section, Click Here For Table Of Contents Click Here to Return to Main Table of Contents Section Parts ListCabinet & Hinged Metal Door Parts Hinged Vision Panel Door Parts Thermometer & Grill One Section Refrigerator Components Electrical Box AssemblyTwo & Three Section Refrigerator Components One Section Freezer Components Two & Three Section Freezer Components Number of Sections Shelves & PilastersUpright Part Number Type Part Number Number of Sections Upright Part Number One Steel Rod Pan Slide Racks and Upright PartsSection Wiring Diagrams 3 Section Refrigerator Section Freezer End Of Section, Click Here For Table Of Contents Phone 856 428-4200 Fax 856 Victory Refrigeration