Victory Refrigeration V-Series manual Procedure for Obtaining Replacement Compressors in Warranty

Page 4

PROCEDURE FOR OBTAINING REPLACEMENT

COMPRESSORS IN WARRANTY

Changes in engineering standards cause variations in compressor specifications. These changes are brought about by our upgrading programs and our suppliers engineering product changes. It is impractical for the customer to go to the manufacturer for the replacement compressor. Suppliers have set up wholesaler organizations to handle replacements on a local basis.

The standard O.E.M. (original equipment manufacturers) warranties are for an unconditional 20 months from date of manufacture at their factory. This allows several months for Victory to install a compressor and get the cabinet into the field.

A defective compressor must be taken to a local wholesaler and exchanged for a new one. If the first three digits of the defective compressor serial number shows that it is less than 20 months old, the wholesaler is obligated to give an even exchange.

The additional four year warranty is available from Victory Refrigeration, 110 Woodcrest Road, Cherry Hill, NJ 08003.

If the defective compressor is past 20 months of age, it must be exchanged with the local wholesaler and the service company, dealer, or the customer must temporarily pay for a new compressor, *less any salvage value of the original. A copy of the original wholesale invoice and salvage credit memo, must then be sent to Victory, with the model and serial number of our cabinet. Victory will reimburse them for the net exchange price, less any labor, freight, tax, or handling charges. Reimbursements are not prorated over the five year warranty.

(*Note: Salvage credit applies to Copelamatic units only)

If any difficulties arise beyond those mentioned, please call us directly at 1-800-523-5008.

iii

Image 4
Contents Series Reach-In Refrigerators and Freezers Limited Warranty General Conditions Procedure for Obtaining Replacement Compressors in Warranty Retain this Manual for Future Reference Table of Contents Section Description Control and Component Location Component Function Description Dimensions End Of Section, Click Here For Table Of Contents Section Installation Unpackaging ProcedureReceiving Shipment Removing DoorsRehingeability One & Two Section Long Door Cabinet Hinges and Lock KeeperLock Keeper Installing Legs or Casters Locating Your New Storage Refrigerator or FreezerCleaning Cabinet Installing ShelvesLeveling Initial Cabinet Set-UpAngle Type Pan Slides Steel Rod Type Pan Slide Racks Refer to FigureElectric Supply Installation Checklist Temperature Control Section OperationThermometer Operation Loading ProductSection Maintenance Initial Cleaning of CabinetPeriodic Cleaning Daily Exterior Surface Cleaning Cleaning and sanitizingWeekly Interior Accessory Cleaning Once Every Three Months, Condenser MaintenanceLubrication Use of Proper Tools and Cleaning Methods Treat Hard WaterSection Troubleshooting Troubleshooting & Servicing Refrigeration System End Of Section, Click Here For Table Of Contents Section Parts List Click Here to Return to Main Table of ContentsCabinet & Hinged Metal Door Parts Hinged Vision Panel Door Parts Thermometer & Grill Electrical Box Assembly One Section Refrigerator ComponentsTwo & Three Section Refrigerator Components One Section Freezer Components Two & Three Section Freezer Components Shelves & Pilasters Number of SectionsUpright Part Number Type Part Number Steel Rod Pan Slide Racks and Upright Parts Number of Sections Upright Part Number OneSection Wiring Diagrams 3 Section Refrigerator Section Freezer End Of Section, Click Here For Table Of Contents Victory Refrigeration Phone 856 428-4200 Fax 856