Cornelius CCM CCU manual Freight Claim Procedure, Freight Claims Important Inspect Promptly, Page

Page 5
Freight Claim Procedure

Freight Claim Procedure

Freight Claims Important!

Inspect Promptly

This merchandise has been carefully inspected and packed in accordance with the carrier’s packing specifications. Responsibility for safe delivery has been assumed by the carrier. If loss or damage occurs, you as the consignee must file a claim with the carrier and hold the container for carrier’s inspection.

Visible Loss or Damage

Any external evidence of loss or damage must be fully described and noted on your freight bill or express receipt and signed by the carrier’s agent. The claim should be filed on a form available from the carrier.

Concealed Loss or Damage

If loss or damage does not appear until merchandise has been unpacked, make a written request for inspection by the carrier within 15 days of the delivery date. Then file a claim on a form from the carrier.

File Claim Without Delay

Do Not Return Damaged Merchandise to Cornelius

Page iii

Image 5
Contents Revision A Publication Number Revision Date SeptemberInstallation, Start-upand Maintenance Manual Nordic Ice MakerPage Forward How To Use This ManualKeep this manual for future reference PageFreight Claim Procedure Table of ContentsInstallation Guidelines Start-UpProcedureFreight Claims Important Inspect Promptly Freight Claim ProcedureVisible Loss or Damage Concealed Loss or DamageSample Data Plate Model and Serial Number FormatModel Number Serial NumberElectrical Specifications Installation Guidelines Installation GuidelinesAdjustments Ambient Operating TemperaturesAttach the ice machine to the bin or Installation Guidelinesdispenser with the provided PageAir Flow Remote Condenser InstallationRemote Condenser Guidelines Installation GuidelinesPage Remote Condenser GuidelinesRemove the grill screws to access the control box ON-OFF-WASHSwitch is located in the control boxElectrical and Plumbing Requirements PageRemove the grill screws to access the control box ON-OFF-WASHSwitch is located in the control boxElectrical and Plumbing Requirements PagePage Electrical and Plumbing RequirementsIncludes 50Hz. Units Page Includes 50Hz. And 3 Phase UnitsElectrical and Plumbing Requirements Page Includes 50Hz. and 3 Phase UnitsElectrical and Plumbing Requirements Page Electrical and Plumbing RequirementsPage Electrical and Plumbing RequirementsPage How the CCM Ice Machine WorksHow the Ice Machine Works Page Start-UpProcedure Start-UpProcedureBridge Thickness and Timer Adjustment Bin Control Adjustment Start-UpProcedure Bin Control OperationUndercounter Models PagePage General MaintenanceGeneral Maintenance Procedure Page Cleaning ProcedureIce Machine Cleaning and Sanitizing Instructions Cleaning Activity Cabinet Care Cleaning stainless steelCleaning Agent Method of ApplicationPage Winterizing Procedure Winterizing ProceduresPage Service HistoryService History