COMPONENT TEST PROCEDURE
CAUTIONS
1.DISCONNECT THE POWER SUPPLY CORD FROM THE OUTLET WHENEVER REMOVING THE OUTER CASE FROM THE UNIT. PROCEED WITH THE TEST ONLY AFTER DISCHARGING THE HIGH VOLTAGE CAPACITOR AND REMOVING THE WIRE LEADS FROM THE PRIMARY WINDING OF THE HIGH VOLTAGE TRANSFORMER. (SEE PAGE
2.ALL OPERATIONAL CHECKS WITH MICROWAVE ENERGY MUST BE DONE WITH A LOAD (1 LITER OF WATER IN CONTAINER) IN THE OVEN.
COMPONENTS | TEST PROCEDURE | RESULTS |
HIGH VOLTAGE TRANSFORMER (Wire leads removed)
FILAMENT WINDING
SECONDARY
PRIMARY
TERMINAL
1.Measure the resistance.
¥ Primary winding | Approx.: 0.2 ~ 0.4 ohm |
¥ Secondary winding | Approx.: 60 ~ 90 ohm |
¥ Filament winding | Less than: 1 ohm |
2. Measure the resistance. |
|
| |
¥ Primary winding to ground | Normal: Infinite |
¥ Filament winding to ground | Normal: Infinite |
MAGNETRON
(Wire leads removed)
1. | Measure the resistance. |
|
| Normal: Less than 1 ohm | |
| ¥ Filament terminal |
|
2. | Measure the resistance. |
|
| Normal: Infinite | |
| ¥ Filament to chassis |
|