Whirlpool EDP/EDN warranty Servicing, 8A. Sequence of Operation

Page 21

Endurance

Page 21

 

 

 

 

jacket, remove the four (4) long screws that secure the top and bottom pans. Remove the air vent and the top pan. Remove the insulation retainer and the coil cover insulation. Clean the boiler coil with a wire brush and vacuum debris from the combustion chamber (avoid hitting the ignitor or the flame sensor with the brush or vacuum hose because they are fragile).

After cleaning, assemble the parts in the reverse order, open isolation valves and bleed air from the boiler and the system. Follow the lighting instructions and start the boiler. Check operation.

seconds while the [MC] indicates alternately and the current boiler outlet temperature.

2.Following the prepurge cycle the ignitor will heat for 10 seconds while the blower continues to operate.

3.The gas valve will then be energized (green ‘GV’ LED located on the PCB next to the display will light) and open, gas will flow and ignition will occur.

SECTION 8

Servicing.

8A. Sequence of Operation

Figures 22 and 23 depict the flow paths and temperature sensor locations for the space heating, EDP/EDN, and the combined space heating and domestic water heating, EBP, appliances.

The model EDP/EDN modulating boilers are cold start boilers that will start only on a call for heat from a room thermostat or zone control contact. During normal operation the Message Center [MC] LED display will indicate ‘ON’ while awaiting a call for heat. On a call for heat the following sequence will occur.

1.(a) The internal pump will start.

(b) After 5 seconds the blower prepurge cycle will start and operate for approximately 6

Figure 27. EDP/EDN Flow Schematic.

Figure 28. EBP Flow Schematic.

Image 21
Contents Endurance Table of Contents General Information 1A. Introduction1B. Codes and Standards Venting Options Endurance Laars Heating Systems For Appliances Certified as Direct Vent 2E. Air Source For Combustion when not direct vented2F. Connecting Special Gas Vent to the Appliance 2G. Securing Special Gas Vent3A. Gas Piping Length Capacity of Pipe 3B. Domestic Water Piping EBP only4A. Hydronic Piping Hydronic Heat PipingHydronic Piping EDP/EBP with Zone Valves Hydronic Piping EBP/EDP for Systems Zoned with Circulators 4C. Water Quality and Treatment Electrical ConnectionsMultiple Zones with Circulators and Room Thermostats For Your Safety Read Before Operating Fermeture DE L’ALIMENTATION EN GAZ To read or change mode Boiler Start Up6A. Common Vent Test 6C. Firing Burner 6B. Filling the SystemMaintenance and Component Description 7J. Cleaning the Boiler Coil 7E. Ignitor / Flame Sensor Assembly7F. Transformer 7G. Blower8A. Sequence of Operation Servicing8B-1. Fault Code Identification 8B. Trouble Shooting Fault CodesPower UP Fault Tree Ignition Fault Tree Space Heating Domestic HOT Water Boiler Temperature Poor flame sensor signal The boiler control EDP/EDN Wiring Diagram EBP Wiring Diagram 9A. Gas Valve Calibration offset adjustment Symptom Evaluations10A. Delayed ignition Gas Valve Calibration10B. Short Cycling 10C. Noisy Operation10D. Insufficient Hot Water EBP only 10E. High Gas Consumption Model EDP/EDN Parts IdentificationBoiler Drain Model EBPBox Lynnfield, MA Phone Fax