Whirlpool EDP/EDN warranty 3B. Domestic Water Piping EBP only, Length Capacity of Pipe

Page 9

Endurance

 

 

 

 

 

 

 

 

 

 

 

 

Page 9

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Length

 

 

 

 

 

 

Capacity of Pipe

 

 

 

 

 

 

of Pipe

 

 

1/2"

3/4"

 

 

1"

1-1/4"

 

 

ft.

 

m

MBTU/h

 

kW

MBTU/h

 

kW

MBTU/h

 

kW

MBTU/h

 

kW

 

10

 

3

132

 

38.7

278

 

81.5

520

 

152.4

1050

 

307.7

 

20

 

6.1

92

 

27

190

 

55.7

350

 

102.6

730

 

213.9

 

30

 

9.1

73

 

21.4

152

 

44.5

285

 

83.5

590

 

172.9

 

40

 

12.2

63

 

18.5

130

 

38.1

245

 

71.8

500

 

146.5

 

50

 

15.2

 

 

 

115

 

33.7

215

 

63

440

 

128.9

 

75

 

22.9

 

 

 

93

 

27.2

175

 

51.3

360

 

105.5

 

100

 

30.5

 

 

 

79

 

23.1

150

 

44

305

 

89.4

 

150

 

45.7

 

 

 

64

 

18.8

120

 

35.2

250

 

73.3

 

 

 

 

 

 

 

Additional length to be added for each tee or bend

 

 

 

 

 

 

 

ft

 

m

ft

 

m

ft

 

m

ft

 

m

 

 

 

 

1.3

 

0.4

1.7

 

0.5

2.2

 

0.7

2.7

 

0.8

 

Table 3.

1.Run gas supply line in accordance with all applicable codes.

2.Locate and install manual shutoff valves in accordance with state and local requirements.

3.Install drip leg, ground joint union and drip cap to trap sediment and for test gauge access.

4.Support all piping with proper hangers.

5.All threaded joints should be coated with piping compound resistant to the action of liquefied petroleum gas.

6.The boiler and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of ½ psig (3.5kPa).

7.The boiler must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than ½ psig (3.5kPa)

8.The boiler and its gas connection must be leak tested before placing the boiler in operation.

9.Purge all air from gas lines.

be no higher than 120°F mixed delivery temperature or as local codes dictate. LAARS RECOMMENDS ANTI-SCALD TEMPERING (MIXING) VALVES (see Figure 12).

2.Connect gate or shutoff valve 13 to tempering (mixing) valve 12 “MIX” port, and cold water inlet.

3.Install supplied flow restrictor 14 ahead of tempering (mixing) valve tee.

4.Connect pressure relief valve 1 (if required by codes), maximum 150 PSI as close to the unit as possible. No other valves or restrictions may be installed between the Endurance and the relief valve.

DO NOT USE A TEMPERATURE/PRESSURE RELIEF VALVE AS THIS IS NOT A STORAGE HOT WATER HEATER.

Note: Installations with water containing 10 or more grains of hardness, must be installed with appropriate water treatment.

3B. Domestic Water Piping (EBP only)

1.Connect tempering (mixing) valve 12 “Hot” port to hot water outlet from unit. This valve should

Figure 12. Domestic Water Piping.

Figure 13. Domestic Water Piping With Storage Tank.

Image 9
Contents Endurance Table of Contents General Information 1A. Introduction1B. Codes and Standards Venting Options Endurance Laars Heating Systems For Appliances Certified as Direct Vent 2E. Air Source For Combustion when not direct vented2F. Connecting Special Gas Vent to the Appliance 2G. Securing Special Gas Vent3A. Gas Piping Length Capacity of Pipe 3B. Domestic Water Piping EBP only4A. Hydronic Piping Hydronic Heat PipingHydronic Piping EDP/EBP with Zone Valves Hydronic Piping EBP/EDP for Systems Zoned with Circulators 4C. Water Quality and Treatment Electrical ConnectionsMultiple Zones with Circulators and Room Thermostats For Your Safety Read Before Operating Fermeture DE L’ALIMENTATION EN GAZ To read or change mode Boiler Start Up6A. Common Vent Test 6C. Firing Burner 6B. Filling the SystemMaintenance and Component Description 7J. Cleaning the Boiler Coil 7E. Ignitor / Flame Sensor Assembly7F. Transformer 7G. Blower8A. Sequence of Operation Servicing8B-1. Fault Code Identification 8B. Trouble Shooting Fault CodesPower UP Fault Tree Ignition Fault Tree Space Heating Domestic HOT Water Boiler Temperature Poor flame sensor signal The boiler control EDP/EDN Wiring Diagram EBP Wiring Diagram 9A. Gas Valve Calibration offset adjustment Symptom Evaluations10A. Delayed ignition Gas Valve Calibration10B. Short Cycling 10C. Noisy Operation10D. Insufficient Hot Water EBP only 10E. High Gas Consumption Model EDP/EDN Parts IdentificationBoiler Drain Model EBPBox Lynnfield, MA Phone Fax