Whirlpool 2180913 manual Operating Instructions, Unit Wiring Diagrams

Page 8

Operating Instructions

l For complete operation information, refer to the Use and Care Guide.

lBefore starting, wash out interior of cabinet with a Baking Soda solution (2 tablespoons [26 grams] soda to 1 quart [l liter] of warm water). Rinse thoroughly.

lMake certain the water is turned on. l Turn switch to the “ON”position.

IMPORTANT: Allow unit to run for 3 hours before expecting ice and for 24 hours before trying to set the thickness control.

If installed above 2,000 feet (600 m) above sea level, see page 2 for thermostat adjustments.

CUBELET GRID

3/4” x 3/i” (19 mm x 19 mm)

Unit Wiring Diagrams

This model operates at 115 volts except for the cutter grid circuit which operates at 8.5 volts at 1 amp.

The compressor runs at all times except when the Bin Thermostat becomes satisfied and opens the circuit. This de-energizes the system except for the transformer and cutter grid.

Under normal operating conditions, when the evaporator reaches the preset temperature (+lO” to -3°F [-12” to -19%], depending on thickness of ice) the evaporator thermostat opens, terminating operation of the fan motor and pump motor. The hot gas solenoid and the water valve solenoid are energized at this time and remain so until the evaporator reaches 38” + 2°F (3” + 1“C).

Electrical Shock Hazard

Disconnect power before servicing unit.

Failure to do so could result in electrical shock.

NOTE: A 15 or 20-ampere time-delay fuse or circuit breaker is recommended.

8

Image 8
Contents Installation Shipboard operation Changing The Bin Door And Lower PanelsThermostat calibrations General Information UnpackUtilities Locate UnitFor Level unitWater observe Local codes Use VI 6 mm OD soft copper tubing forUnit is provided with a gravity drain Connect drain pumpConnect to drain observe local codes Grounding method For The ElectricianElectrical1 requirements Instructions are located on the inner door panel How The Ice Maker WorksThings To Remember Unit Wiring Diagrams Operating InstructionsCheck Operation Replace grilleSchema de cdblage Ne pas oublierItalonnage des thermostats Utilisation de la machine 6 glaqons sur un bateauChoix de l’emplacement RenseianementsCwh6raux DbballageMise d’aplomb LesObserver les dispositions des codes loeaux Raccordement B I’hgoutRaccordement a la pompe d’bacuation M6thode de liaison ZJla terre Instructions & I’intention de WlectricienSpkifications de I’alimentation klectrique Mode de fonctionnement Ne pas oublierRisque de choc electrique Instructions d’utilisationSch6ma de cgblage Contr6le du fonctionnement