INSTALLATION
07. Screw in lower screws (hex screws).
08. Stick protective film over the holes of the 2 lower mounting bolts in the protective grid.
09. Connect up the air outlet pipe.
10.Connect the hood to the electricity supply.
11.Remove the protective film from the two flue ducts.
Take care not to damage the surfaces which are susceptible to scratches etc.
Warning: The interior walls of the flue panelling can have sharp edges – Risk of injury
We recommend that you wear gloves when installing.
12.Push both sections of the flue panelling together (slots in the upper section must be pointing downwards) and insert into the opening in the hood.
Protect the cover panels from scratches, for example by laying the template used for marking the wall over the top edge of the lower section.
13.Insert the cover panels at an angle and tilt them back.
The bottom panel must snap in the bolts at the back.