DCS RDS-364GD manual Integral Ventilator Installation, Wiring the Hood

Page 17

INSTALLATION

INTEGRAL VENTILATOR INSTALLATION

The Integral ventilator can be mounted to discharge air as shown in Figure 9. From the inside of the hood, slip motor into the bracket on the left. Rotate motor upwards until it snaps into the spring clip on the right.

IMPORTANT: Secure the motor to the hood with the machine screw and lock washer.

WIRING THE HOOD:

WARNING:

Turn off electricity at the service panel before wiring the unit.

Branch circuit requirement is 120V, 60Hz, 15A (minimum).

1.Connect the Integral Ventilator molex plug connector to the connector present inside the hood as shown in Figure 9 or Figure 10.

2.Remove the j-box cover as shown in Figure 11.

3.Remove 1 of 2 knockouts and install 1/2” conduit connector in j-box.

4.Run black, white, and green wires (#18 AWG) in 1/2” conduit from power supply to j-box.

5.Connect the black to black (hot line) wire, white to white (common line) wire and green/yellow wire to ground in j-box cover.

6.Close j-box cover.

7.For ES36 only: mount the filter trim bracket supplied on the right side of the hood. Check that all engage points perfectly match, then fix with 3 screws as shown in figure 12.

Final installation steps

Replace filters and grease trays as described in the Use & Care manual. Turn power on at service panel. Check operation of the hood.

SCREW

LOCATIONS

Integral ventilator fixing point

Bracket

Motor

Motor support Spring clip connector

FIG. 9

FIG. 10

Power supply conduit

From control panel

FIG. 12

FIG. 11

15

Image 17
Contents Professional and Euro Vent Hood Page Please Retain this Manual for Future Reference Message to OUR CustomersTable of Contents Safety Practices and Precautions To reduce the risk of a range top grease fire Safety Practices & PrecautionsSafety Practices & Precautions Wall Mount Venthhood Product DimensionsEuro Venthood Parts not Included with Your Hood PartsParts Included with Your Hood Vent unit to outside of building only Before Installing HoodTypical Installation Infrared Lamp and Panel KIT ElelctricalDucting Vertical Discharge FigureHood Installation Height InstallationWall Mount Installation Hood Model Assembly and Installation Duct Covers Cabinet Preparation Cabinet InstallationES Series Wiring the Hood Integral Ventilator InstallationBefore YOU Call for Service HOW to Obtain ServiceLimited Warranty WarrantyHOW Long does this Limited Warranty LAST? This Warranty does not CoverNo Other Warranties HOW to GET ServiceCommercial USE Modèles Hotte DE Ventilation Série Professionnelle ET EuropéenneVeuillez Conserver CE Manuel À Titre DE Référence Lintention DE NOS ClientsAvertissement Avertissement Relatif À LA Sécurité Table DES MatièresMise EN Garde Mesures DE Sécurité ET DE PrécautionPour réduire les risques de feu de graisse sur la cuisinière Mesures DE Sécurité ET DE Précaution Hotte À Évacuation À Montage Mural Dimensions DU ProduitHotte À Évacuation Européenne Pièces NON Incluses Avec LA Hotte PiècesPièces Incluses Avec LA Hotte Installation Typique Avant Dinstaller LA HotteLampe Infrarouge ET KIT DE Panneau ElectricalConduits VerticaleMontage Mural Modèle DE Hotte Hauteur dinstallation de la hotteMettez la hotte de niveau et serrez les vis dans la fente Assemblage ET Installation DES COUVRE-CONDUITSES30/ES36 Hotte DE Série VS30/VS36 Hotte DE Série Avant Dinstaller LA HotteImportant Fixez le moteur à la hotte Installation EN ArmoireInstallation DU Ventilateur Intégral Câblage DE LA Hotte Avertissement Câblage DE LA Hotte Avec UN Ventilateur IntégralAvant Dappeler LE Service Technique Pour Lobtention DE ServiceGarantie Limitée GarantieFisher & Paykel Sengage À Quelle EST Durée DE Cette Garantie LIMITÉE?Utilisation Commerciale Pour Obtenir DES RéparationsAucune Autre Garantie Remarque Remarque
Related manuals
Manual 74 pages 31.15 Kb