INSTALL THE DUCTWORK

NOTE: To reduce the risk of fire, use only metal ductwork.

1.Decide where the ductwork will run between the hood and the outside.

2.A straight, short duct run will allow the hood to perform most efficiently.

3.Long duct runs, elbows, and transitions will reduce the performance of the hood. Use as few of them as possible. Larger ducting may be required for best performance with longer duct runs.

4.Install a roof or wall cap. Connect round metal ductwork to cap and work back to- wards hood location. Use duct tape to seal the joints between ductwork sections.

INSTALL SUPPORT SYSTEM

1.At hood location, install 2 x 4 cross framing between ceiling joists using dimensions shown on center.

2.Finish the ceiling surface. Be sure to mark the location of the ceiling joists and cross framing.

3.Position the support frame as shown. The UP ARROW should point towards the ceiling after installation.

4.Secure the support frame to joists and cross framing with four screws (6x70mm) and washers provided. Make sure screws are driven into center of joists and framing for maximum strength.

5.Adjust the overall height of the support frame. Loosen and re-tighten the screws in the height adjustment slots as necessary. Note that the hood height is 14- 3/16” (360mm) and that the bottom of the hood must be 24” min. and 30” max. above the cooktop.

TOP VIEW OF SUPPORT FRAME 9-13/16”

9-13/16”

CROSS FRAMING

ROOF CAP

ROUND

DUCT

DECORA -

ROUND

 

ELBOW

EAVE

TIVE

HOOD

FLUE

VENT

24” TO 30” ABOVE COOKING SURFACE

6” ADAPTER

DRYWALL

CROSS FRAMING

913/16

CEILING

JOISTS

MOUNTINGWASHERS

SCREWS(Ø6.4mm) (6x70mm)

SUPPORT

FRAME

OPENINGS

SUPPORT

FRONT FRAME

HEIGHT

ADJUSTMENT

SLOTS

- 6 -

Image 6
Contents Model IS170 Français EspañolPage Read and Save These Instructions Intended for Domestic Cooking only ! WarningPage Prepare the Hood Install the Ductwork Install Support SystemConnect Decorative Flue Non-ducted recirculation configuration Installation of Glass Connect DuctworkWiring NON-DUCTED Recirculation Filter InstallationMount Hood to Support Frame Glass Cleaning MaintenanceHood Cleaning Grease FiltersOperation ControlsHalogen Bulbs Fuse ReplacementSwitch OFF the Electricity Supply HOTWarranty Broan ONE Year Limited WarrantyLisez ET Conservez CES Instructions Seulement Pour Utilisation Domestique AvertissementsPage Preparez LA Hotte Installation DU Systeme D’EVACUATION Installation DU Systeme DE SupportAssemblage DU Conduit Decoratif Modèle avec tuyau d’évacuationModèle recyclant l’air Montage DE LA Vitre OptionInstallation Electrique Connexion DU Systeme D’EVACUATIONMontage DE LA Hotte SUR LA Structure DE Support Filtres anti-graisse Assemblage DU FiltreEntretien Filtre à charbonCommandes FonctionnementAvertissement ’AMPOULE Peut Etre Chaude Remplacement FusibleAmpoules Halogenes Débranchez L’APPAREILGarantie Garantie Broan Limitée À UN ANLEA Y Conserve Estas Instrucciones AdvertenciaAdvertencia Prepare LA Campana Instalacion DEL Tubo DE Extraccion Instalacion DEL Sistema DE SujecionConfiguración con tubo Instalacion DEL Tubo DecorativoConfiguración sin tubo Montaje DEL Cristal Tubo DE Extraccion DE HumosMontaje DE LA Campana AL Armazón DE Soporte Instalacion ElectricaInstalacion DEL Filtro Filtro al carbón MantenimientoFiltros antigrasa Limpieza de la campanaHeat Sentrymr FuncionamientoMandos AvertenciaPueden Estar Calientes Lamparas HalogenasSustitucion Fusible Desconectar EL AparatoGarantia Garantia Broan POR UN AÑOService Parts DescriptionListe Pieces DE Rechange Part N DescriptionLista DE Piezas DE Recambio CÓD. N Pieza N DescripciónModel IS170 Heat Sentry Page 04307109/4S