Cartridge Installation
qMake sure that you follow the instructions included with your cartridge.
wConnect the lead wires to the respective terminals. Industry standard cartridges come with
Red (R+) |
|
| Right Channel+ | Green |
|
| Right Channel - | ||
|
|
|
| ||||||
White |
|
|
| Left Channel+ | B l u e |
|
|
| L e f t Channel - |
|
|
|
|
NOTE
If using a light weight cartridge, we suggest the use of the shell weight enclosed.
NUT
SHELL
(OPTION r)
SHELL WEIGHT
(OPTION y)
CARTRIDGE
(ACCESSORY)
STYLUS
(ACCESSORY)
SCREWS
(ACCESSORY)
LEAD WIRE
TERMINAL
(ACCESSORY)
eThe overhang of your cartridge needs to be adjusted to best suit the A.S.T.S tone arm. For best tracking and stylus pressure a distance of 50mm (as shown) should be set.
50mm
NOTE
To avoid premature damage to the stylus take care to avoid touching it during any adjustment(s).
rInsert the head shell into the front part of the tone arm. Turn the looking ring in the direction shown below until the head shell is firmly fixed in place.
7