Installation – Mounting the Range Hood
|
|
| www.zephyronline.com | |
! CAUTION: At least two installers are |
| C/L |
| |
required due to the weight and size of the |
|
| ||
hood. |
|
|
| |
1. | Measure distance from range top to hood bottom (30” min) Level | B |
|
|
| and mark line A. | wood board | 4” | |
|
| |||
2. | Plum and mark center line. |
|
| 12 3/8” |
3. | Mark mounting height line B. (12 3/8” from line A) |
|
| |
|
|
| ||
| (This is the top of the board used to hang the hood) | A |
|
|
4. | Mark center line of wood board and align top of board with line B. |
|
| |
| Secure wood board to studs using (4) M4 wood screws. Wood Board |
|
|
|
| Dimensions: (W x D x H) |
|
| min |
| AK7836ASX - 34” x 3/4” x 4” |
|
| |
|
|
| 30” | |
| AK7842ASX - 40” x 3/4” x 4” |
|
| |
|
|
|
| |
| AK7848ASX - 46” x 3/4” x 4” |
|
|
|
5. | Hang hood on wood board and secure using (4) M4 x 16 screws. |
|
|
|
| NOTE: Due to the weight of this hood, ensure that the wood strip |
|
|
|
| is attached to every available stud, not into the drywall alone. |
|
|
|
6. | Install blower(s). Turn to page 11 for blower installation |
|
|
|
| instructions. |
|
|
|
7. | Install electrical. |
| C/L |
|
8. | Install duct work and duct tape. |
|
| |
|
|
| ||
9. | Power up hood and check for leaks around duct tape. |
|
|
|
10. Install optional accessories: duct cover (fig. 2). For more detailed |
| fig. 1 |
| |
| instructions refer to manual included with each accessory. |
|
| |
|
|
|
|
11. Reinstall baffle filters.
fig. 2
10