Zephyr AK7848ASX, AK7842ASX, AK7836ASX manual Installation Single and Dual Internal Blowers

Page 13

CBI-600B AND PBI-1100A BLOWER INSTALLATION

1. Position blower plate over bracket on inside

2. Connect male end of blower wire to female plug

back of hood and pivot up. Secure plate to hood

in the hood. (plug is located inside the hood

with (2) 10x3/16” screws. (blower pictured is a

behind the control panel)

PBI-1100A)

 

3.Single Blower – Connect 6” round duct work to blower collar.

Dual Blower – Place 10” round adapter on top of hood and secure with (4) M4x8 screws.

Connect 10” round duct work to 10” round adapter.

Installation – Single and Dual Internal Blowers

11

Image 13
Contents Use, Care, and Installation Guide Page Installation Table of ContentsTo Reduce the Risk of Range TOP Grease Fire Important Safety NoticeOperation Parts Supplied List of MaterialsDuct pieces Equivalent number Total Length x used Installation Ducting Calculation SheetMounting Height & Clearance InstallationDucting Some Ducting Options OptionsMarine Grade 316S Body Installation SpecificationsElectrical Installation ElectricalCable Lock 12 3/8 Installation Mounting the Range HoodCBI-600B and PBI-1100A Blower Installation Installation Single and Dual Internal BlowersBlower Preparation CBE-1000 External or PBN-1000A IN-LINE Blower InstallationBlower Speed Selection Features & Controls Rocker Switch ControlsMaintenance Cleaning and Filter RemovalSurface Maintenance Replacing Light Bulbs Maintenance LightsTroubleshooting Procedures for Cypress TroubleshootingIssue Cause What to do Replacement Parts List of Parts and AccessoriesOptional Accessories Description