USER manual 11
WALL HOOD INSTALLATION
STEP 4 Install chimney
♦♦ Take off protective laminate coating
♦♦ Place the chimney on top of range hood base
♦♦ Make sure the chimney is facing the correct direction (the vertical vent should be on the top)
♦♦ Secure the lower portion of the chimney to the base of the hood
♦♦ Attach the chimney to the ceiling mounting bracket
♦♦ Screw the chimney into place on both sides
♦♦ Now the chimney is secured to the ceiling and wall
STEP 5 Install grease filter
♦♦ Peel off any protective tape or film. ♦♦ Pop spring loaded filter into place
♦♦ That’s it! Now you’re ready to try out your new range hood