Proline PLJW117 user manual Install ceiling bracket, Hang hood and connect

Page 14

10PROLINE RANGE HOODS

WALL HOOD INSTALLATION

STEP 2 Install ceiling bracket

Place the chimney bracket against the ceiling

Find the center point of the bracket and mark it

Line the bracket center point with the center point on the wall

Mark the locations of bracket holes on wall Drill holes into the wall where you’ve marked Install wall anchors into these holes

Screw ceiling bracket into place

Chimney will mount on this bracket

STEP 3 Hang hood and connect

Carefully hang the hood on the wall, attaching it to the studs using the screws already in place

Line up bottom of range hood with your bottom line on the wall

Tighten and anchor the hood to the wall

Make sure to anchor the hood to a stud so the wall can support the weight of the range hood

Attach your ductwork to the top of the hood Duct tape into place

Find the three pronged plug and connect to an electrical outlet

Image 14
Contents Proline Proline Customer Support Team Table of Contents Important Safety Notice To reduce the risk of a range top grease fire Wall Hood Control Panel Aluminum filter Grease FiltersBaffle filter Ductless Filters Charcoal filterVertical Roof Venting Venting OptionsHorizontal Wall Venting OptionVenting Requirements Height & Venting RequirementsTools YOU’LL Need PreparationInspect Range Hood Prepare DuctworkWall Hood Installation Install anchors and screwsInstall ceiling bracket Hang hood and connectInstall chimney Install grease filterCleaning Exterior Surfaces Care & CleaningCleaning the filter Removing the filter Replacing the Light BulbTroubleshooting Nothing Works Control Panel not lit, Blower not workingOne Year Warranty Parts Only WarrantyTwo Year Warranty Parts & Labor What is not CoveredReturns ReturnsUpon Receipt of Your Hood Return Claims not Accepted if ExchangesExchanges Please NoteProline Range Hoods