Kobe Range Hoods CH0136SQB, CH0130SQB, CH0142SQB, CH0148SQB F E T Y W a R N I N G

Page 10

Ductwork Installation

7.Use 8” aluminum or steel pipe (follow building codes in your area) to connect the ducting transition on the hood to the ductwork above. Use duct tape to seal and secure joints as shown in Figure 5.

Wiring to Power Supply

S A F E T Y W A R N I N G

TO PREVENT THE RISK OF ELECTRICAL SHOCK OR INJURY, ALL RANGE HOODS SHOULD BE PROPERLY GROUNDED AND INSTALLED BY A TRAINED PROFESSIONAL WHO IS KNOWLEDGEABLE ABOUT APPLICABLE NATIONAL AND LOCAL ELECTRICAL CODES.

BEFORE CONNECTING WIRES, SWITCH POWER OFF AT SERVICE PANEL TO PREVENT POWER FROM BEING SWITCHED ON ACCIDENTALLY.

8.Connect electrical wires.

-Connect three wires (black, white and green) to house wires and cap with wire connectors. Connect wires according to their colors (i.e. black to black, white to white, and green to green). See Figure 6.

-Prevent wires from slipping between motor and any moving parts by securing in electrical box.

Final Assembly

CAUTION: Install heating lamps last.

9.Drop Oil Tunnel into support structure. Refer to Figure 7.

10.Angle baffle filter toward back of hood ￿. Refer to Figure 8.

11.Push baffle filter up until almost level ￿.

12.Slide forward into recess at front of hood ￿.

13.Lower baffle filter ￿ and slide back until it fits into resting position ￿.

14.Repeat for all baffle filters and spacers. Refer to Measurements and Diagrams on page 21 for baffle filter and stainless spacer arrangement.

7

Figure 5

Figure 6

Figure 7

Image 10
Contents Kobe Brand Range Hood CH0136SQB CH0142SQB CH0148SQBPage Contents Read and Save These InstructionsRange TOP Grease Fire Page Components of Package Must keep all material for returns or refundsFor Under the Cabinet InstallationCalculation before Installation For Stand Alone with Optional Duct CoverInstallation Table of Contents Under the Cabinet Installation Preparation Before InstallationF E T Y W a R N I N G Page Stand Alone Installation Hood Preparation Before InstallationBefore Releasing Duct Cover Installation Operating Instructions Speed Control Maintenance Cleaning Hood SurfaceCleaning Stainless Oil Tunnel, Baffle Filters and Spacers Specifications Measurements & Diagrams For Under the Cabinet Page For Stand Alone with Optional Duct Cover Baffle Filter & Stainless Steel Spacers Parts List Description MODEL/SIZEOptional Duct Cover Sold Separately Blower Assembly Description Model / SizeElectrical Assembly Switch Assembly Circuit Diagram Model NO. CH0130SQB CH0136SQB Model NO. CH0142SQB CH0148SQB Claims will not be Accepted After the Allocated Days TWO-YEAR Warranty Service Period Warranty Warranty CertificateConditions Consequential Damage ServiceImplied WARRANTIES/STATE LAW Register Your Product Product RegistrationRecord the Following Information for Your Record 060726