Installation Items Needed

5/16" hex socket wrench or nut-driver

sealant (resistant to propane/LP gas, not provided)

1.Open lower door panel.

2.Route flexible gas line (provided by installer) from equipment shutoff valve to burner system. Route flexible gas supply line through slot in stove bot- tom and attach to valve.

3.Attach a 45° flare union gas connector to flexible gas line from gas supply (see Figure 32). Connect flare union to flex- ible gas line attached to gas regulator of fireplace (see Figure 32).

4.Check all gas connections for leaks. See Checking Gas Connections.

Equipment

Shutoff Valve

 

To Gas

 

Supply

 

(Natural)

Flexible Gas Line from

To External

Equipment Shutoff Valve

Regulator

Provided by Installer

(Propane/LP)

 

Figure 32 - Attaching Flexible Gas Lines Together

CHECKING GAS

CONNECTIONS

WARNING: Test all gas pip- ing and connections for leaks after installing or servicing. Cor- rect all leaks at once.

WARNING: Never use an open flame to check for a leak. Apply commercial leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

Pressure Testing Gas Supply Piping System

Test Pressures In Excess Of 1/2 PSIG (3.5 kPa)

1.Disconnect appliance with its appliance main gas valve (control valve) and equipment shutoff valve from gas supply piping systems. Pressures in excess of 1/2 psig (3.5 kPa) will damage burner system gas regulator.

2.Cap off open end of gas pipe where equipment shutoff valve was con- nected.

3.Pressurize supply piping system by ei- ther opening propane/LP supply tank valve for propane/LP gas burner sys- tem or opening main gas valve located on or near gas meter for natural gas burner system, or using compressed air.

4.Check all joints of gas supply piping system. Apply commercial leak test so- lution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

5.Reconnect burner system and equip- ment shutoff valve to gas supply. Check reconnected fittings for leaks.

Test Pressures Equal To or Less Than 1/2 PSIG (3.5 kPa)

1.Close equipment shutoff valve (see Figure 33).

2.Pressurize supply piping system by ei- ther opening propane/LP supply tank valve for propane/LP gas burner sys- tem or opening main gas valve located on or near gas meter for natural gas burner system, or using compressed air.

3.Check all joints from propane/LP sup- ply tank or gas meter to equipment shutoff valve (see Figure 34 for pro- pane/LP or Figure 35 for natural). Ap- ply commercial leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

Pressure Testing Burner System Gas Connections

1.Open equipment shutoff valve (see Fig- ure 33).

2.Open propane/LP supply tank valve for propane/LP burner system or main gas valve located on or near gas meter for natural gas burner system.

3.Make sure control knob of burner sys- tem is in the OFF position.

4.Check all joints from equipment shutoff valve to thermostat gas valve (see Fig- ure 34 for propane/LP or Figure 35 for natural, page 15). Apply commercial leak test solution to all gas joints. Bubbles forming show a leak. Correct all leaks at once.

5.Light burner system (see Lighting In- structions, page 19). Check all other in- ternal joints for leaks.

6.Turn off burner system (see To Turn Off Gas to Appliance, page 19).

Open

Equipment

Shutoff

Valve

Closed

Figure 33 - Equipment Shutoff Valve

For more information, visit www.desatech.com

14

106706

Image 14
Contents For Your Safety What to do if YOU Smell GAS OWNER’S Operation and Installation ManualFor Your Safety Safety Information SUN Valley Stove CompanyLocal Codes Product FeaturesProduct Identification OperationPRE-INSTALLATION Preparation Location and Space RequirementsCast Iron Stove and B-VENT Burner System Assembly Stove Body AssemblyAttaching Stove Legs Installing B-VENT Burner System Into Stove Body Installing Optional Blower AccessoryInstalling Rear Cover Green Ground WireType B-VENT Installation Listed B-0 or Greater Venting InstallationInstallation Precautions Checking Vent Capacity Installation of Listed B-1 VentInstalling Vent System in a Chase Relining Systems High Altitude InstallationChimneys Troubleshooting Venting Problems Stove and B-VENT Burner System InstallationInstallation Items Needed External Regulator with Vent Pointing Down Propane/LP OnlyPressure Testing Burner System Gas Connections Connecting Stove and Burner System to GAS SupplyPressure Testing Gas Supply Piping System Checking GAS ConnectionsInstalling Optional Wall Mounted Switch GWMS2 Checking Gas Joints for Propane/LP Gas Burner SystemInstalling Optional Wall Mounted Thermostat GWMT1, GWMS2 Installing Remote ReceiverInstalling 9-Volt Battery in Hand- Held Remote Control Unit REMOVING/REPLACING Glass DoorInstalling LOGS, Lava ROCK, and Glowing Embers Installing Log NoOperating Stove with B-VENT Burner System For Your Safety Read Before LightingManual Lighting Procedure Lighting InstructionsGhrc Series Operation Optional Remote OperationThermostat Control Operation Ghrcta Series OperationInspecting Burners Operating Optional Blower AccessoryPilot Assembly Operating Optional GWMT1 Wall Mounted ThermostatPilot and Burners Cleaning and MaintenanceGlass Door LogsTroubleshooting Observed Problem Possible CauseObserved Problem Possible Cause Remedy Gas leak. See Warning statement Wiring Diagram Replacement PartsTechnical Service Service HintsSpecifications AccessoriesIllustrated Parts Breakdown Msrbvn MsrbvpParts List KEY Part Number Description QTYSUN Valley Stove MC* Series Indicates Color Suffix DesignationKEY Part Description QTY Warranty Information International

MSRBVP, MSRBVN specifications

Desa MSRBVN and MSRBVP are two innovative residential community projects that have garnered attention for their design, sustainability, and technological integrations. These developments aim to cater to the growing demand for modern living spaces that balance comfort, efficiency, and environmental responsibility.

One of the main features of Desa MSRBVN and MSRBVP is their careful urban planning. These communities provide an array of housing options, from single-family homes to multi-unit residences, ensuring that there is something for everyone, including families, young professionals, and retirees. The layouts are designed to maximize natural light and airflow, creating a pleasant living environment.

Sustainability is a cornerstone of both projects. The communities incorporate green building practices that reduce their carbon footprint. This includes the use of energy-efficient materials, solar panels for renewable energy generation, and greywater recycling systems that help manage water resources effectively. Landscaping is also thoughtfully designed, with native plants that require minimal irrigation and support local biodiversity.

Technologically, Desa MSRBVN and MSRBVP are at the forefront of smart living. Each home is equipped with advanced home automation systems, allowing residents to control lighting, heating, and security features remotely. Integration with mobile applications provides users with seamless access to their home systems, enhancing convenience and safety.

Safety and community are also pivotal aspects. These developments include well-lit public spaces, walking paths, and recreational areas that encourage outdoor activities and social interaction. Security measures, such as gated entries and surveillance systems, ensure that residents feel secure within their community.

In terms of connectivity, both Desa MSRBVN and MSRBVP benefit from strategic locations that offer easy access to public transportation, shopping centers, schools, and healthcare facilities. This makes daily commutes and lifestyle requirements more manageable for residents.

Overall, Desa MSRBVN and MSRBVP exemplify the future of residential living, where thoughtful design, sustainability, and technology converge to create vibrant and connected communities. As urban areas continue to evolve, such projects highlight the importance of integrating modern living solutions that prioritize residents' well-being and environmental stewardship.